Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEERS0002 Mapping and Delivery Guide
Decommission electrical and electromechanical rail signalling from service

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERS0002 - Decommission electrical and electromechanical rail signalling from service
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to decommission electrical and electromechanical rail signalling from service on rail networks.It includes preparing to withdraw electrical and electromechanical rail signalling from service. It also includes completing disconnection of operating and redundant circuitry, equipment and components; testing of remaining circuitry and equipment; finding and repairing faults; testing of control and indicating equipment; and reporting.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in suitable rail workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in suitable rail simulated workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or other simulations

relevant and appropriate materials, tools, facilities, equipment and personal protective equipment (PPE) currently used in industry

resources that reflect current industry practices in relation to decommissioning electrical and electromechanical signalling from service

applicable documentation, including workplace procedures, equipment specifications, regulations, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Rail Signalling
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to decommission electrical and electromechanical rail signalling from service
  • Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
       
Element: Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures implemented in preparation for work
       
Element: Scope of decommissioning is determined from job specifications, design drawings and regulatory requirements
       
Element: Appropriate safe working person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
       
Element: Materials needed for the safe disconnection of circuits, equipment and components are obtained in accordance with workplace procedures and checked against job specifications
       
Element: Tools, equipment and testing devices needed to disconnect circuits, equipment and components are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Withdraw electrical and electromechanical rail signalling from service
  • WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
       
Element: On-track safe working requirements are complied with in accordance with relevant industry standards and network rules
       
Element: Inspection is carried out and circuits, equipment and components are checked to ensure they are in accordance with manufacturer and system specifications
       
Element: Disconnecting, isolating and removal of redundant wiring; the termination of altered wiring; and checking indicators and signal system operation are completed in accordance with network requirements and relevant industry standards
       
Element: Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes
       
Element: Decommissioning is performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
       
Element: System and design faults are verified using relevant, technical information, fault-finding and diagnostic techniques to identify faulty rail signalling equipment
       
Element: Faulty rail signalling equipment is replaced, adjusted and secured in accordance with manufacturer specifications and workplace procedures
       
Element: Control equipment is adjusted, inspected and tested using workplace test procedures and equipment to ensure it operates in accordance with specified industry technical standards
       
Element: Complete decommissioning work and reports
  • WHS/OHS work completion risk control measures and workplace procedures are followed
       
Element: System faults are identified and reported for follow-up action in accordance with workplace procedures
       
Element: Inspection and test results are documented in accordance with workplace procedures and faulty or replaced equipment is tagged and despatched to maintain equipment spares
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

reading and interpreting specifications correctly

disconnecting signalling circuits, equipment and components to meet operational and technical standards

using effective fault diagnosis and repair/replacement techniques to specified model level

confirming circuits, equipment and components operated within specified technical parameters

testing equipment and instruments

using tools correctly

following relevant codes of practice, environmental protection procedures and requirements

completing relevant technical reports, records and documentation

dealing with unplanned events

applying rail safe working practices and relevant industry standards, codes and rail safety regulations

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:

implementing workplace procedures and practices

using risk control measures

applying sustainable energy principles and practices

decommissioning electrical and electromechanical rail signalling from service in accordance with workplace procedures

preparing to decommission electrical and electromechanical rail signalling from service

withdrawing electrical and electromechanical rail signalling from service.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

electrical and electromechanical rail signalling decommissioning, safe working practices and relevant standards, codes and regulations, including:

purpose of decommissioning

decommissioning planning and documentation

decommissioning requirements and hazards

decommissioning procedures

fault diagnosis and repair/replacement techniques

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant safe working practices, industry standards, codes of practice, regulations and WHS/OHS legislated requirements, including decommissioning requirements and hazards

relevant workplace documentation.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified 
 
 
 
 
 
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed 
 
 
 
 
 
 
 
 
WHS/OHS work completion risk control measures and workplace procedures are followed 
 
 

Forms

Assessment Cover Sheet

UEERS0002 - Decommission electrical and electromechanical rail signalling from service
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERS0002 - Decommission electrical and electromechanical rail signalling from service

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: