Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERS0004 Mapping and Delivery Guide
Find and repair rail signalling system faults
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0004 - Find and repair rail signalling system faults | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to find and repair rail signalling system faults.It includes preparing to find and repair signalling system faults, using appropriate fault-finding techniques, repairing or rectifying faults and completing reporting requirements.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Rail Signalling |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to find and repair rail signalling system fault/s |
| |||||||
Element: Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work | ||||||||
Element: Safety hazards that have not previously been identified are documented on job safety assessments, risks are assessed, and control measures determined and implemented in consultation with appropriate person/s | ||||||||
Element: Appropriate person/s is consulted to determine the nature and scope of the fault/s and to coordinate effectively with others affected by the fault/s | ||||||||
Element: Likely causes of the fault/s and order of probability are determined from system data and historical trends | ||||||||
Element: Impact of the fault on system is ascertained and appropriate person/s notified in accordance with workplace procedures | ||||||||
Element: Materials needed to find and repair the fault are obtained in accordance with workplace procedures and checked against job specifications | ||||||||
Element: Tools, equipment and testing devices needed to find and repair the fault/s are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Circuits/equipment are inspected and checked as being isolated, where necessary, in strict accordance with operational procedures and WHS/OHS requirements | ||||||||
Element: Find and repair rail signalling system faults |
| |||||||
Element: Signalling system performance parameters/standards are applied to appropriate fault-finding techniques | ||||||||
Element: Inspection and tests are conducted to determine the type and location of fault/s | ||||||||
Element: Wiring system is visually inspected for physical damage or installation defects, as required | ||||||||
Element: Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes | ||||||||
Element: Ongoing inspections and checks of the signalling system are undertaken to confirm the continued rectification of the fault | ||||||||
Element: Fault/s are located and identified efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Signalling system faults are rectified in accordance with workplace procedures | ||||||||
Element: Complete repair/s to rail signalling system |
| |||||||
Element: Unresolved faults are reported to appropriate person/s for further action in accordance with workplace procedures | ||||||||
Element: Inspection and test results, actions taken or recommended are documented and appropriate person/s notified in accordance with workplace procedures | ||||||||
Element: Component fault/s, test result/s, authorisation/s and permit/s documentation are completed to provide an accurate database and facilitate follow-up action and relevant reports |