Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERS0006 Mapping and Delivery Guide
Install and maintain computer-based interlocking rail systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0006 - Install and maintain computer-based interlocking rail systems | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install/maintain computer-based electronic equipment for rail network signalling system.It includes preparing and installing/maintaining computer-based interlocking (CBI) equipment. It also includes completing installation/maintenance of CBI systems and replacing faulty equipment requirements.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Rail Signalling |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install/maintain CBI rail equipment |
| |||||||
Element: Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work | ||||||||
Element: Scope of installation/maintenance work is determined from job specifications, drawings and regulatory requirements | ||||||||
Element: Materials needed for the installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications | ||||||||
Element: Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Install/maintain CBI rail system |
| |||||||
Element: Reports or fault logs are identified by accessing diagnostic terminal | ||||||||
Element: Fault correction activities are prioritised by reviewing the fault reports and previous corrective actions | ||||||||
Element: Records of previously corrective actioned faults are deleted/cleared from the terminal | ||||||||
Element: Source of the fault is identified by assessing the diagnostics terminal | ||||||||
Element: Corrective action required is determined and implemented | ||||||||
Element: Appropriate mechanisms for the safe and efficient rectification of the fault are determined | ||||||||
Element: Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes | ||||||||
Element: Rail system monitoring is conducted efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Replacement equipment is obtained from spare stock to comply with identified fault repair requirements | ||||||||
Element: Faulty component/equipment is identified and removed in accordance with organisation practices and procedures | ||||||||
Element: Replacement component/equipment is installed and connected to power in accordance with manufacturer specifications | ||||||||
Element: Correct test procedures are identified and implemented to confirm all operations are within specifications | ||||||||
Element: Equipment operations are monitored to ensure system integrity | ||||||||
Element: Signal and voltage levels are monitored, checked and adjusted, as required, in accordance with operational requirements | ||||||||
Element: Completed statistical records and equipment/operational management information are accurately recorded and maintained to support ongoing monitoring of systems and equipment performance | ||||||||
Element: Complete CBI rail system installation/maintenance |
| |||||||
Element: Non-conforming equipment is identified and tagged for repair type and extent of fault is identified and recorded, as required | ||||||||
Element: Faulty equipment requiring repair is segregated and appropriate records are completed in preparation for despatching to repairer | ||||||||
Element: Spare equipment stocks are reviewed to ensure adequate availability | ||||||||
Element: Priority for repair and/or replacement of equipment is determined by evaluation of stock levels and fault logs | ||||||||
Element: Work completion is documented and appropriate person/s notified of repair and replacement priorities in accordance with workplace procedures and relevant reports produced |