UEERS0011 Mapping and Delivery Guide
Install and maintain rail track circuit leads and bonds
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0011 - Install and maintain rail track circuit leads and bonds | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install/maintain track circuit leads and bonds of rail signalling electrical power and control systems.It includes following workplace procedures, job planning, running and positioning, connecting track leads and bonds, maintaining and testing track leads and bonds, and completing required documentation.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Rail Signalling |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install/maintain track circuit leads and bonds |
| |||||||
Element: Hazards are identified, risks assessed, and control measures and workplace procedures implemented | ||||||||
Element: Safety hazards that have not previously been identified are noted on job safety assessments and existing risk control measures implemented | ||||||||
Element: Appropriate person/s is consulted to ensure work is coordinated effectively with others involved on the worksite | ||||||||
Element: Installation/maintenance instructions are reviewed to obtain clear and concise work requirements | ||||||||
Element: Site bonding layout plan is reviewed to clarify bonding requirements | ||||||||
Element: Material to install/maintain track circuit leads and bonds is obtained in accordance with workplace procedures and checked against job specifications | ||||||||
Element: Tools, equipment and testing devices to install/maintain track circuit leads and bonds are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Preparatory work is checked to ensure no unnecessary damage has occurred and complies with job specifications | ||||||||
Element: Install/maintain track circuit leads and bonds |
| |||||||
Element: Specified leads of bonds are run and positioned appropriately to the formation conditions and to minimise potential damage from track maintenance machines | ||||||||
Element: Installation/maintenance of track circuit leads and bonds are appropriately sequenced in accordance with job schedule | ||||||||
Element: Positions of boxes and cable pits are checked to ensure compliance with specifications and appropriate follow-up action is initiated, as required | ||||||||
Element: Components and rail surfaces are prepared to ensure secure and sound connections in accordance with job specifications | ||||||||
Element: Leads or bonds are connected using specified fastening techniques ensuring technical compliance is achieved | ||||||||
Element: Established methods for dealing with unplanned situations are discussed with appropriate person/s and documented in accordance with workplace procedures | ||||||||
Element: Unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of an authorised person | ||||||||
Element: Track circuit leads and bonds are installed and connected efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Bonds, leads and rail connections are inspected for damage or deterioration and appropriate corrective action is initiated in accordance with workplace procedures | ||||||||
Element: Appropriate tests are completed to identify components requiring repair or replacement in accordance with workplace procedures and job specifications | ||||||||
Element: Repair or replacement of components is carried out with due regard to train movements and safety of person/s involved | ||||||||
Element: Temporary bonding is installed, as required, and electrical readings on bonds/lead connections and insulated rail joints are taken to ensure compliance with specifications and site bonding layout plan | ||||||||
Element: Track-related equipment is inspected for faults or damage and all faults are documented and appropriate follow-up action is initiated in accordance with workplace procedures | ||||||||
Element: Complete installation/maintenance of track circuit leads and bonds |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Work completion is documented, relevant reports produced and appropriate person/s notified in accordance with workplace procedures |