Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERS0020 Mapping and Delivery Guide
Apply rail signalling principles
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0020 - Apply rail signalling principles |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Identify health and safety legislative requirements of different signalling works |
| |||||||
Element: Duty of care requirements are identified | ||||||||
Element: Onsite rail signalling safe work practices are identified and explained | ||||||||
Element: Identify types of signalling equipment |
| |||||||
Element: Different types of signalling interlocking systems are identified | ||||||||
Element: Identify key information in signalling design documents |
| |||||||
Element: Signalling arrangement plans/track plans are interpreted and equipment and structures are identified when inspecting a rail signalling works/site | ||||||||
Element: Key information is located in a track insulation/bonding plan when inspecting a rail signalling works/site | ||||||||
Element: The structure of a circuit book is interpreted, and key information is located | ||||||||
Element: Apply basic signalling terminology and conventions |
| |||||||
Element: Naming and numbering conventions are applied to a range of signalling designs | ||||||||
Element: Relevant signalling standards are accessed and interpreted | ||||||||
Element: Fail safe, right side and wrong side failures are identified | ||||||||
Element: Apply rail signalling principles |
| |||||||
Element: The difference between controlled and automatic signalling is identified | ||||||||
Element: Workplace procedures for maintaining independence when conducting checking or verifying actions are interpreted and applied |