Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERS0021 Mapping and Delivery Guide
Assemble and wire electrical rail signalling equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0021 - Assemble and wire electrical rail signalling equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to assemble and wire signalling equipment |
| |||||||
Element: Hazards are identified, risks assessed, and control measures and workplace procedures are implemented | ||||||||
Element: Safety hazards that have not previously been identified are noted on the job safety assessments and existing risk control measures implemented | ||||||||
Element: Technical requirements relating to specific signalling equipment are obtained | ||||||||
Element: Assembly and wiring are appropriately sequenced in accordance with job schedule | ||||||||
Element: Appropriate person/s is consulted to ensure work is coordinated effectively with others involved on the worksite | ||||||||
Element: Materials needed for assembly wiring and cabling are obtained in accordance with workplace procedures and checked against job requirements | ||||||||
Element: Tools, equipment, and testing devices needed to assemble and wire equipment are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Rail signalling equipment is prepared for assembly and wiring in accordance with workplace procedures, drawings/diagrams and relevant specifications | ||||||||
Element: Assemble and wire signalling equipment |
| |||||||
Element: Equipment is assembled, wired, connected and labelled to comply with technical standards and job specification requirements | ||||||||
Element: Risk control measures for dealing with unplanned situations are discussed with appropriate person/s and documented in job safety assessments | ||||||||
Element: Unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of authorised person/s | ||||||||
Element: Equipment is assembled, wired, connected and labelled efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Complete assembly and wiring ofsignalling equipment |
| |||||||
Element: Wire and cable terminations are checked in accordance with workplace installation procedures to ensure tightness and functionality | ||||||||
Element: Continuity and insulation tests are carried out in accordance with workplace test procedures to ensure and verify system standards are met | ||||||||
Element: Wiring and cabling diagrams, quality requirements and safety issues are addressed and relevant reports/documentation are updated and completed in accordance with workplace procedures | ||||||||
Element: Completed signalling equipment is reported and released for independent testing and certification |