Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERS0023 Mapping and Delivery Guide
Inspect, test and certify rail power signal equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0023 - Inspect, test and certify rail power signal equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to inspect, test and certify power signalling circuits, equipment and components |
| |||||||
Element: Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures implemented in preparation for work | ||||||||
Element: Scope of inspection, testing and certifying is determined from job specifications, design drawings and regulatory requirements | ||||||||
Element: Appropriate safe working person/s is consulted to ensure work activity is coordinated effectively with others involved on the worksite | ||||||||
Element: Materials needed for testing and certifying of power signalling circuits, equipment and components are obtained in accordance with workplace procedures and checked against job specifications | ||||||||
Element: Tools, equipment and testing devices needed to inspect, test and certify power signalling circuits, equipment and components are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Test leads and bridges are identified and recorded to ensure that they are in accordance with the relevant standard | ||||||||
Element: Inspect, test and certify power signalling circuits, equipment and components |
| |||||||
Element: On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system | ||||||||
Element: Inspection is carried out and circuits, equipment and components are checked to ensure they are in accordance with manufacturer and system specifications | ||||||||
Element: Inspecting, testing and certifying work includes installation, termination and operation of the signalling equipment; and checking indicators and signal system operation is completed in accordance with network requirements and relevant industry standards | ||||||||
Element: Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes | ||||||||
Element: Inspection, testing, certifying and repairs are performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Straps and bridges are used in accordance with the relevant standard and with the appropriate authority | ||||||||
Element: System and design faults are verified using relevant industry technical standards information, fault-finding and diagnostic techniques to identify faulty wiring equipment and components | ||||||||
Element: Identified irregularities and non-conforming wiring, equipment or components are documented and immediate follow-up action is initiated to ensure faults are rectified | ||||||||
Element: Faulty signalling equipment is replaced, adjusted and secured in accordance with manufacturer specifications and workplace procedures | ||||||||
Element: Complete testing and certifying work and reports |
| |||||||
Element: Inspection and test results are documented in accordance with workplace procedures and faulty or replaced equipment is tagged and despatched to maintain equipment spares | ||||||||
Element: All straps and bridges are removed and compared against the initial record of leads, straps and bridges | ||||||||
Element: Incomplete testing is recorded and handed over to approved/ person/s for follow up | ||||||||
Element: Operational equipment is handed over to approved person/s in accordance with handover workplace procedures and final documentation is completed |