Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERS0026 Mapping and Delivery Guide
Maintain communications based signalling equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0026 - Maintain communications based signalling equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to maintain communications based signalling equipment |
| |||||||
Element: Hazards are identified, WHS/OHS risks are assessed, and control measures and workplace procedures implemented in preparation for work | ||||||||
Element: Scope of maintenance is determined from maintenance schedules, job specifications, workplace requirements | ||||||||
Element: Appropriate rail safe working person/s is consulted to ensure work is coordinated effectively with others to minimise rail traffic disruption | ||||||||
Element: Materials needed for the maintenance work are obtained in accordance with workplace procedures and checked against job specifications | ||||||||
Element: Tools, equipment and testing devices needed for maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Equipment prechecks are completed in accordance with workplace procedures | ||||||||
Element: Authorisation to take temporarily out of service is obtained in accordance with workplace procedures | ||||||||
Element: Maintain communications based signalling equipment |
| |||||||
Element: On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system | ||||||||
Element: Connection points are located and connection established in accordance with workplace procedures | ||||||||
Element: Pre-service tasks and tests are completed in accordance with workplace procedures | ||||||||
Element: Equipment faults/damage are identified using efficient fault-finding and diagnostic techniques, including fault indicators, error codes and maintenance records | ||||||||
Element: Equipment/component abnormalities are identified, and appropriate remedial actions taken to ensure equipment conforms and performs to technical specifications | ||||||||
Element: Maintenance is conducted in accordance with schedule and workplace procedures without waste of materials, damage to apparatus, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes | ||||||||
Element: Complete communications based signalling equipment maintenance |
| |||||||
Element: Post-service tasks are completed in accordance with workplace procedures | ||||||||
Element: Confirmation that system is functional and that no alarms are present or indicated | ||||||||
Element: Equipment is taken out of service/brought back into use, as required, and documentation is completed in accordance with workplace procedures | ||||||||
Element: Work records and documentation are completed to ensure accurate maintenance records are maintained | ||||||||
Element: Worksite/equipment is reinstated in accordance with organisation requirements |