Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEERS0030 Mapping and Delivery Guide
Maintain power-operated point actuating devices

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERS0030 - Maintain power-operated point actuating devices
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to maintain power-operated point actuating device
  • Work health and safety (WHS)/Occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
       
Element: Hazards are identified, WHS/OHS risks are assessed, control measures and workplace procedures are implemented in preparation for work
       
Element: Scope of the maintenance is determined from maintenance schedules, job specifications, drawings and regulatory requirements
       
Element: Appropriate rail safe working personnel are consulted to ensure work is coordinated effectively with others involved on the worksite
       
Element: Materials needed for the maintenance are obtained in accordance with workplace procedures and checked against job specifications
       
Element: Tools, equipment and testing devices needed for maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Authorisation to take temporarily out of service or disable systems is obtained in accordance with workplace procedures
       
Element: Maintain power-operated point actuating device
  • WHS/OHS risk control measures and workplace procedures for carrying out work are followed
       
Element: On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system
       
Element: Maintenance, cleaning, brushing and lubricating work are carried out on point actuating devices in accordance with technical and operational specifications
       
Element: Adjustments to point actuating devices are made to ensure correct operation, and perway fastenings and timbers are inspected in accordance with operational specifications
       
Element: Position and mounting of point actuating devices are checked in accordance with site layout and operational specifications
       
Element: Maintenance is performed efficiently, without waste of materials, damage to apparatus, the surrounding environment or services using sustainable energy practices
       
Element: Function of equipment is determined from technical data, maintenance handbooks, workplace and equipment operating procedures
       
Element: Faulty, worn, damaged or insecure components are replaced, repaired or secured in accordance with technical and manufacturer specifications to ensure operational effectiveness
       
Element: Equipment is inspected and tested in accordance with workplace testing procedures to ensure operational and technical requirements are achieved
       
Element: Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes
       
Element: Complete power-operated point actuating device maintenance
  • WHS/OHS work completion risk control measures and workplace procedures are followed
       
Element: Confirmation that system is functional and that no alarms are present or indicated
       
Element: On-track safe working requirements are removed in accordance with workplace procedures and safety management system
       
Element: Documentation is completed to provide an accurate maintenance record and Network Control Officer informed of work status details
       
Element: Reusable, faulty or worn components are tagged and despatched for repair to maintain adequate spares
       
Element: Faulty perway conditions/components are documented to provide details for corrective/follow-up action
       
Element: Point actuating devices are temporarily taken out of service, reinstated back into service and certified in accordance with organisation requirements and workplace procedures
       
Element: Maintenance work activities are recorded in accordance with organisation requirements to provide accurate records and produce relevant reports
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/Occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified 
 
 
 
 
 
 
WHS/OHS risk control measures and workplace procedures for carrying out work are followed 
 
 
 
 
 
 
 
 
 
WHS/OHS work completion risk control measures and workplace procedures are followed 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEERS0030 - Maintain power-operated point actuating devices
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERS0030 - Maintain power-operated point actuating devices

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: