Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERS0036 Mapping and Delivery Guide
Repair rail signalling power and control cables
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERS0036 - Repair rail signalling power and control cables |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to repair rail signalling cables |
| |||||||
Element: Hazards are identified, risks assessed, and control measures and workplace procedures implemented | ||||||||
Element: Safety hazards that have not previously been identified are noted on the job safety assessments and existing risk control measures implemented | ||||||||
Element: Access times and safe work methods are confirmed to comply with customer requirements and relevant rail safety legislation | ||||||||
Element: Appropriate person/s is consulted to ensure work is coordinated effectively with others on the worksite | ||||||||
Element: Extent and nature of the fault or damage to the rail signalling cable is confirmed with appropriate person/s in accordance with workplace procedures | ||||||||
Element: Cable joining kit is obtained in accordance with workplace procedures and components checked with manufacturer specifications | ||||||||
Element: Cable diagrams necessary to effect repairs are obtained, read and interpreted | ||||||||
Element: Tools and cable testing devices for cable repair are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Repair damaged rail signalling cables |
| |||||||
Element: On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system | ||||||||
Element: Corresponding ends of broken cable core are identified by core marking and confirmed by continuity test in accordance with workplace procedures | ||||||||
Element: Cable joining kit is used to repair damaged cable following manufacturer specifications and workplace procedures | ||||||||
Element: Repair to damaged cable is tested for cable core continuity insulation between cable cores and cores to earth in accordance with workplace procedures | ||||||||
Element: Cause of failed cable test is located and rectified in accordance with workplace procedures | ||||||||
Element: Existing work methods for dealing with unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of an authorised person/s | ||||||||
Element: Cable repair is completed without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Complete rail signalling cable repairs |
| |||||||
Element: Work area is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: On-track safe working requirements are removed in accordance with workplace procedures and safety management system | ||||||||
Element: Cable repair work, test results and relevant reports are documented and appropriate person/s notified in accordance with workplace procedures |