Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG012 Mapping and Delivery Guide
Construct and lay plastic gas distribution mains
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG012 - Construct and lay plastic gas distribution mains |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to construct and lay plastic gas distribution mains |
| |||||||
Element: Job requirements are obtained and interpreted from plans, specifications and instructions | ||||||||
Element: Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s, including third parties, to determine and confirm work schedule and respective responsibilities | ||||||||
Element: Hazards are identified, workplace safety and environmental risks are assessed, and control measures are prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Scope of responsibility under the relevant job requirements, including all work permits and/or relevant notifications, is determined and confirmed to access the services and perform work in accordance with job requirements and workplace procedures | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) needed to carry out work activities are identified, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures | ||||||||
Element: Construct and lay plastic gas distribution mains |
| |||||||
Element: Appropriate materials, tools and equipment are selected and used safely in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Excavation bed/trench is prepared for laying of plastic pipe in accordance with relevant industry standards and workplace procedures | ||||||||
Element: Construction and laying of plastic gas distribution mains is conducted in accordance with relevant industry standards and workplace procedures | ||||||||
Element: Work is completed within agreed timeframe and to industry standards in accordance with job requirements and workplace procedures | ||||||||
Element: Road signs, barriers and warning devices are positioned in accordance with job instructions, workplace procedures and traffic management plans | ||||||||
Element: Unplanned events are referred to the relevant person/s for directions in accordance with workplace procedures | ||||||||
Element: Complete work and relevant documentation |
| |||||||
Element: Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards | ||||||||
Element: Worksite is cleaned, reinstated and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment, and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Incidents are reported and followed up as required in accordance with workplace procedures | ||||||||
Element: Relevant person/s is notified of work completion in accordance with workplace procedures | ||||||||
Element: Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures |