Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG013 Mapping and Delivery Guide
Construct, lay and connect a gas distribution service to a main
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG013 - Construct, lay and connect a gas distribution service to a main |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to construct and lay a gas service to a plastic main |
| |||||||
Element: Job requirements are obtained and interpreted from plans, specifications and instructions | ||||||||
Element: Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s, including third parties, to determine and confirm work schedule and respective responsibilities | ||||||||
Element: Hazards are identified, workplace safety and environmental risks are assessed, and control measures are prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Scope of responsibility under the relevant job requirements, including all work permits and/or relevant notifications, is determined and confirmed to access the services and perform work in accordance with job requirements and workplace procedures | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) needed to carry out work activities are identified, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions | ||||||||
Element: Pressure, diameter and volume of pipe is confirmed as being classified as a distribution service against industry standards | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures | ||||||||
Element: Construct and lay a gas service to a main |
| |||||||
Element: Appropriate materials, tools and equipment are selected and used safely in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Work is completed within agreed timeframe and to industry standards in accordance with job requirements and workplace procedures | ||||||||
Element: Site is prepared for laying of pipe in accordance with industry standards and workplace procedures | ||||||||
Element: Construction and laying of gas services to main are conducted in accordance with industry standards and workplace procedures | ||||||||
Element: Gas distribution service is connected, tested and commissioned | ||||||||
Element: Faults and operational conditions of the components are identified, repaired or replaced, and reported in accordance with organisational job requirements | ||||||||
Element: Unplanned events are referred to the relevant person/s for directions in accordance with workplace procedures | ||||||||
Element: Complete work and relevant documentation |
| |||||||
Element: Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards | ||||||||
Element: Worksite is cleaned, reinstated and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Incidents are reported and followed up as required in accordance with workplace procedures | ||||||||
Element: Relevant person/s is notified of work completion in accordance with workplace procedures | ||||||||
Element: Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures |