Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG016 Mapping and Delivery Guide
Establish right of way access and maintain transmission pipeline easement
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG016 - Establish right of way access and maintain transmission pipeline easement |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to inspect, establish and maintain pipeline easement |
| |||||||
Element: Job requirements are obtained and interpreted from plans, specifications and instructions | ||||||||
Element: Topographical/geographical maps and workplace procedures for the site are obtained and job requirements are discussed with relevant person/s to confirm the work schedule | ||||||||
Element: Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s, including third parties, to determine and confirm work schedule and respective responsibilities | ||||||||
Element: Easements and surrounding environments are inspected and assessed using appropriate mediums and civil activities to determine requirements in accordance with workplace procedures and job requirements | ||||||||
Element: Hazards are identified, workplace safety and environmental risks are assessed, and control measures are prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Scope of responsibility under the relevant job requirements, including all work permits and/or relevant notifications, is determined and confirmed to access the services and perform work in accordance with job requirements and workplace procedures | ||||||||
Element: Equipment, appropriate vehicles, tools and personal protective equipment (PPE) needed to carry out work activities are identified, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures | ||||||||
Element: Maintain pipeline easement and surrounding environment |
| |||||||
Element: Appropriate materials, vehicles, tools and equipment are selected and used safely in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Work is completed within agreed timeframe and to industry standards in accordance with job requirements and workplace procedures | ||||||||
Element: Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures | ||||||||
Element: Alarms, codes and hazard warnings are correctly recognised, and the correct response strategy is selected and applied in accordance with workplace procedures | ||||||||
Element: Unplanned events and non-routine problems are identified and actioned in accordance with workplace procedures | ||||||||
Element: Safety issues identified and remedial action required when establishing or maintaining pipeline easements are dealt with in accordance with workplace procedures | ||||||||
Element: Complete work and relevant documentation |
| |||||||
Element: Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards | ||||||||
Element: Worksite is cleaned, reinstated and made safe in accordance with workplace procedures | ||||||||
Element: Tools, vehicles, equipment and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Incidents are reported and followed up as required in accordance with workplace procedures | ||||||||
Element: Relevant person/s is notified of work completion in accordance with workplace procedures | ||||||||
Element: Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures |