Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEGNSG053 Mapping and Delivery Guide
Install and commission stationary gas fuelled turbine engines

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG053 - Install and commission stationary gas fuelled turbine engines
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install stationary gas fuelled turbine engine
  • Workplace safety, environmental and sustainable energy practices for the site are identified, obtained and understood
       
Element: Job requirements are obtained and interpreted from plans, specifications and instructions
       
Element: Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s, including third parties, to determine and confirm work schedule and respective responsibilities
       
Element: Hazards are identified, workplace safety and environmental risks are assessed, and control measures are prioritised, implemented and monitored in accordance with workplace procedures
       
Element: Scope of responsibility under the relevant job requirements, including all work permits and/or relevant notifications, is determined and confirmed to access the services and perform work in accordance with job requirements and workplace procedures
       
Element: Gas fuelled turbine engine plant, equipment and component specifications and manufacturer manuals are obtained for planned work activity
       
Element: Locations of plant, equipment, fuel train pipework and components are planned within the constraints of worksite, specifications and requirements
       
Element: Gas fuelled turbine engine materials needed for the installation work are obtained in accordance with design specification and workplace procedures
       
Element: Equipment, tools and personal protective equipment (PPE) needed to carry out work activities are identified, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions
       
Element: Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures
       
Element: Install stationary gas fuelled turbine engine
  • Workplace safety and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed
       
Element: Relevant gas regulator and code of practice recording, and reporting requirements are undertaken at appropriate times throughout the work sequence
       
Element: Gas and electrical circuits/machines/plant are isolated in accordance workplace safety requirements and workplace procedures
       
Element: Stationary gas fuelled turbine engine components, fuel train and associated pipework and flue/exhaust systems are installed in accordance with design specification, industry technical standards and regulatory requirements, with sufficient access to affect terminations, adjustment and maintenance
       
Element: Ventilation systems are installed in accordance with design specification
       
Element: Electrical components, wiring enclosures and wiring terminations are installed in accordance with design and manufacturer specifications, and functional and regulatory requirements
       
Element: Compliance and safety inspections of installed turbine engine, equipment, pipework, components and accessories are undertaken, and defects are rectified
       
Element: Work is completed within agreed timeframe and to industry standards in accordance with job requirements and workplace procedures
       
Element: Unplanned events are referred to the relevant person/s for directions in accordance with workplace procedures
       
Element: Commission stationary gas fuelled turbine engine
  • Workplace safety risk control measures and workplace procedures for carrying out work activities are followed
       
Element: Relevant gas regulator and code of practice recording, and reporting requirements are satisfied at appropriate times throughout the work sequence
       
Element: Gas and electrical safety checks and isolation workplace procedures and purging are completed and recorded to manufacturer and relevant authority requirements before testing and commissioning are commenced
       
Element: Operational parameters of individual components are tested and adjusted to conform with specifications
       
Element: Turbine engine operations are tested, first without and then with fuel, adjustments are completed, as necessary, and results recorded in accordance with approving authority requirements
       
Element: Exhaust gases are analysed in accordance with relevant industry practice and authority requirements
       
Element: Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment safely and with the approval of an authorised person
       
Element: Commissioning is conducted without waste of materials or damage to apparatus and the surrounding environment or services using sustainable energy practices
       
Element: Complete and report installation and commissioning activities
  • Workplace safety work completion risk control measures and workplace procedures are followed
       
Element: Final check of the installed gas fuelled turbine engine is made to verify compliance with job requirements, certification required by relevant gas authorities and industry standards
       
Element: Incidents and injuries are reported and followed up as required in accordance with workplace procedures
       
Element: Tools and equipment are cleaned, checked, serviced and stored in accordance with manufacturer recommendations and workplace procedures
       
Element: Worksite is cleaned/tidied and made safe in accordance with workplace procedures
       
Element: ‘As-installed’ gas fuelled turbine engine equipment, components, pipework, flue/exhaust systems and accessories are documented, accessed and appropriate person/s notified in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Workplace safety, environmental and sustainable energy practices for the site are identified, obtained and understood 
 
 
 
 
 
 
 
 
 
Workplace safety and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed 
 
 
 
 
 
 
 
 
Workplace safety risk control measures and workplace procedures for carrying out work activities are followed 
 
 
 
 
 
 
 
Workplace safety work completion risk control measures and workplace procedures are followed 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG053 - Install and commission stationary gas fuelled turbine engines
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG053 - Install and commission stationary gas fuelled turbine engines

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: