Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG056 Mapping and Delivery Guide
Launch and recover PIGs in gas transmission pipelines
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG056 - Launch and recover PIGs in gas transmission pipelines |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare and plan for pigging gas transmission pipelines |
| |||||||
Element: Job requirements are obtained and interpreted from plans, specifications and instructions | ||||||||
Element: Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s, including third parties, to determine and confirm work schedule and respective responsibilities | ||||||||
Element: Hazards are identified, workplace safety and environmental risks are assessed, and control measures are prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Scope of responsibility under the relevant job requirements, including all work permits and/or relevant notifications, is determined and confirmed to access the services and perform work in accordance with job requirements and workplace procedures | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures | ||||||||
Element: Site, PIG, PIG trap, station and pipeline are prepared to minimise risk and damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Launch and recover gas transmission pipeline PIGs |
| |||||||
Element: Appropriate materials, tools and equipment are selected and used safely in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Work is completed within agreed timeframe and to industry standards in accordance with job requirements and workplace procedures | ||||||||
Element: Gas transmission pipeline PIG is launched, tracked and recovered in accordance with work schedule and workplace procedures | ||||||||
Element: Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures | ||||||||
Element: Alarms, codes and hazard warnings are correctly recognised, and the correct response strategy is selected and applied in accordance with workplace procedures | ||||||||
Element: Data/results from transmission pipeline pigging operations is gathered/retrieved and analysed to determine internal pipeline conditions in accordance with workplace procedures | ||||||||
Element: Testing and inspecting of the pipeline and pigging equipment is conducted in accordance with job requirements and workplace procedures | ||||||||
Element: Faults and operational conditions of the components are identified, repaired or replaced, and reported in accordance with organisational job requirements | ||||||||
Element: Unplanned events are referred to the relevant person/s for directions in accordance with workplace procedures | ||||||||
Element: Re-establish transmission pipeline to operational condition, complete work and relevant documentation |
| |||||||
Element: Retrieved PIG is inspected to determine the wear sustained to the PIG material and anomalies reported in accordance with workplace procedures | ||||||||
Element: Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards | ||||||||
Element: Worksite is cleaned, reinstated and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Incidents are reported and followed up as required in accordance with workplace procedures | ||||||||
Element: Relevant person/s is notified of work completion in accordance with workplace procedures | ||||||||
Element: Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures |