Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG060 Mapping and Delivery Guide
Maintain SCADA controlled flow and pressure equipment and electronic gas measurement equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG060 - Maintain SCADA controlled flow and pressure equipment and electronic gas measurement equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare SCADA controlled gas flow and pressure equipment and electronic gas measurement equipment |
| |||||||
Element: Job requirements are obtained and interpreted from plans, specifications and instructions | ||||||||
Element: Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s, including third parties, to determine and confirm work schedule and respective responsibilities | ||||||||
Element: Hazards are identified, workplace safety and environmental risks are assessed, and control measures are prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Scope of responsibility under the relevant job requirements, including all work permits and/or relevant notifications, is determined and confirmed to access the services and perform work in accordance with job requirements and workplace procedures | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) needed to carry out work activities are identified, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures | ||||||||
Element: Maintain SCADA controlled gas flow and pressure equipment and electronic gas measurement equipment |
| |||||||
Element: Gas detectors are used to determine worksite gas concentration levels and to locate and pinpoint any escaping gas, and supervisor advised immediately if site is unsafe in accordance with workplace procedures | ||||||||
Element: Appropriate materials, tools and equipment are selected and used safely in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Work is completed within agreed timeframe and to industry standards in accordance with job requirements and workplace procedures | ||||||||
Element: Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures | ||||||||
Element: Alarms, codes and hazard warnings are correctly recognised, and the correct response strategy is selected and applied in accordance with workplace procedures | ||||||||
Element: Electrical isolations are scheduled, and local/remote control actuated and communicated in accordance with workplace procedures | ||||||||
Element: Data on system performance, usage and unplanned events is collected, reviewed and reported in accordance with workplace procedures | ||||||||
Element: Gas station venting and purging operations are undertaken in accordance with workplace procedures | ||||||||
Element: Gas flow regulator and meter runs, and components are set up and operated, and system is vented, purged and pressurised in accordance with workplace procedures | ||||||||
Element: Process variables and set points are taken and required adjustments and repairs are carried out in accordance with workplace procedures | ||||||||
Element: Actuators are isolated/de-energised in accordance with manufacturer instructions and workplace company procedures | ||||||||
Element: Faults and operational conditions of the components are identified, repaired or replaced, and reported in accordance with organisational job requirements | ||||||||
Element: Unplanned events are referred to the relevant person/s for directions in accordance with workplace procedures | ||||||||
Element: Complete SCADA maintenance work and relevant documentation |
| |||||||
Element: Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards | ||||||||
Element: Worksite is cleaned, reinstated and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Incidents are reported and followed up as required in accordance with workplace procedures | ||||||||
Element: Relevant person/s is notified of work completion in accordance with workplace procedures | ||||||||
Element: Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures |