UEGNSG109 Mapping and Delivery Guide
Control field pipeline operations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG109 - Control field pipeline operations
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to control and monitor field pipeline operations on a gas pipeline. It includes controlling and shutting down pipeline systems in case of emergencies, monitoring and identifying faults, selecting and using relevant tools and equipment, and completing relevant documentation and reports No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Cross Discipline Units
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan control of pipeline operations
  • Work schedule, drawings, plans, job requirements and material lists are obtained, analysed and confirmed by site inspection, as necessary, and work planned and coordinated in accordance with workplace procedures
       
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures
       
Element: Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
       
Element: Job requirements, work permit/s, resources and workplace procedures for the work are obtained for work site/s and communicated to relevant person/s in accordance with workplace procedures
       
Element: WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied to ensure safe systems of work are followed
       
Element: Relevant work permit/s are obtained to coordinate and perform work in accordance with regulatory and job requirements and workplace procedures
       
Element: Relevant resources required for the work are identified and obtained in accordance with workplace procedures
       
Element: Clients are provided with possible solutions and options within the scope, acceptable cost and job requirements parameters
       
Element: Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures
       
Element: Person/s participating in the work are briefed and responsibilities coordinated and authorised in accordance with workplace procedures
       
Element: Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures
       
Element: Control pipelineoperations
  • WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures
       
Element: Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures
       
Element: Operating conditions, pressures and temperatures of the pipeline are monitored and observed to ensure correct operating parameters are maintained in accordance with workplace procedures
       
Element: Alarms, codes and hazard warnings are correctly recognised and the correct response strategy is selected and applied in accordance with workplace procedures
       
Element: Remedial action/s are taken to address any shortfalls encountered in the work schedule in accordance with workplace procedures
       
Element: Work is coordinated to ensure completion in agreed timeframe and to industry standards with a minimum of waste in accordance with job requirements and workplace procedures
       
Element: Unplanned events and non-routine problems are identified and actioned in accordance with workplace procedures
       
Element: Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards
       
Element: Shut down pipeline system and complete relevant documentation
  • Emergency shutdown procedures are applied to equipment failure and work undertaken in accordance with workplace procedures
       
Element: Accidents and injuries are reported and followed up as required in accordance with workplace procedures
       
Element: Work site is rehabilitated/cleaned up and confirmed safe in accordance with workplace procedures
       
Element: Shutdown is completed in accordance with workplace procedures
       
Element: Pre-shutdown checks are completed, documented and shift handover is conducted in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Training Industry Package Companion Volume Implementation Guide.

resources must include at least seven (7) of the following:

process control equipment

station power supply

heaters and heat exchanges

station instrumentation

drawings and schematics

metering equipment and gas analysis equipment

valves, actuators and flanges

compressors and prime movers

sumps and drains

pipeline inspection gauges (PIGs)

monitoring systems must include at least four (4) of the following:

use of fire and gas extinguishing and deluge systems

emergency systems

alarm and communication systems

supervisory control and data acquisition (SCADA)

prime wovers and compression systems

shutdown systems

pipeline faults must include the following:

gas leaks

electrical problems

compressor or pump failure

out-of-current inspection status

gauge failure or hose rupture leaks

instruments out of calibration

non-flow of gas

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedule, drawings, plans, job requirements and material lists are obtained, analysed and confirmed by site inspection, as necessary, and work planned and coordinated in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures 
 
 
 
 
 
 
 
Emergency shutdown procedures are applied to equipment failure and work undertaken in accordance with workplace procedures 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG109 - Control field pipeline operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG109 - Control field pipeline operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent