Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEGNSG118 Mapping and Delivery Guide
Select and commission equipment to meet pressure and temperature control specifications

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG118 - Select and commission equipment to meet pressure and temperature control specifications
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to select and commission equipment for pressure and temperature control in a natural gas or liquefied petroleum gas (LPG) system. It includes determining equipment pressure and temperature control specifications and performance parameters for natural gas or LPG system. It also includes selecting, planning and overseeing commissioning of equipment and validating natural gas or LPG control system performance.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Cross Discipline Units
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine performance parameters for natural gas or LPG system control
  • Work health and safety (WHS)/occupational health and safety (OHS) principles, practices and environmental and sustainable energy workplace procedures are reviewed and applied
       
Element: Performance parameters for the natural gas or LPG system control are determined from analysed data and expected outcomes of the work is confirmed with appropriate personnel
       
Element: Specifications for performance parameters for the natural gas or LPG system to be controlled are obtained or determined with the appropriate personnel in accordance with workplace procedures
       
Element: Properties and natural gas or LPG characteristics are identified and discussed with appropriate personnel
       
Element: Relevant documentation, industry standards and legislative requirements are determined, analysed and applied
       
Element: Natural gas or LPG system growth requirements are evaluated in determining the control specifications performance requirements
       
Element: Work roles and tasks are allocated in accordance with job requirements and worker/s competencies
       
Element: Work is prioritised and sequenced within an acceptable timeframe in accordance with industry quality standard and workplace procedures
       
Element: Liaison and communication with authorised personnel, authorities, clients and land owners are undertaken to resolve gas system issues and coordinated work activities in accordance with workplace procedures
       
Element: Risk control measures are identified, prioritised and applied to the work schedule
       
Element: Site requirements are identified, risk assessed and relevant work permits are secured to coordinate the performance of work in accordance with job requirements and workplace procedures
       
Element: Plan and oversee commissioning of natural gas or LPG control equipment
  • Control equipment and materials are selected to meet performance, budgetary and WHS/OHS requirements
       
Element: Commissioning plan, inspection and testing criteria are developed and implemented in accordance with workplace procedures
       
Element: Relevant resources are scheduled in accordance with workplace requirements
       
Element: Relevant gas supply authorities and statutory bodies are consulted and notified in accordance with workplace procedures
       
Element: Performance monitoring plan is developed
       
Element: Relevant documentation is completed and authorised by the relevant authorities
       
Element: Specific data is analysed and compared with compliance specifications to ensure completion of project within an agreed timeframe in accordance with job requirements
       
Element: Unplanned events and non-routine problems are identified and actioned, in accordance with job requirements and workplace procedures
       
Element: Quality of work is monitored against performance agreement, workplace procedures and relevant industry standards
       
Element: Validate natural gas or LPG system performance
  • Inspections to validate natural gas or LPG system performance are undertaken to ensure compliance with job requirements and pressure and temperature control specifications, and documentation needed to complete the project is completed
       
Element: System performance is reviewed to ensure performance of the natural gas or LPG system is within specifications
       
Element: Natural gas or LPG system performance is reviewed to ensure balance is maintained with interconnected systems
       
Element: Natural gas or LPG system performance is reviewed to ensure security of supply is within acceptable risk factors and in accordance with relevant industry standards
       
Element: Reports and performance data are completed and lodged with relevant authorities
       
Element: Appropriate personnel are notified of job completion and reports/documents are finalised in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

gas systems must include at least two (2) of the following:

transmission and distribution pipelines

storage facilities

underground storage

LPG installations

tanker and storage facilities

gas characteristics must include at least two (2) of the following:

temperature

chemical composition

pressures and pressure reduction

reserve quantities

LPG evaporation rates

resources must include at least four (4) of the following:

relevant personnel

materials and equipment

personal protective equipment (PPE)

company operating/workplace procedures

equipment manuals

training resources

legislative requirements must include:

WHS/OHS, government acts and regulations

relevant Australian industry standards and codes of practice

environmental legislative requirements

relevant requirements must include at least three (3) of the following:

government authorities

landowners/traditional land owners

stakeholders

local councils

fire authorities

other utilities

statutory authorities

documentation must include at least five (5) of the following:

contracts

specifications

drawings/plans

manufacturer specifications

work permits

company standard operation and safety procedures

company management plans and policies

company forms and files

laws and codes of practice

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) principles, practices and environmental and sustainable energy workplace procedures are reviewed and applied 
 
 
 
 
 
 
 
 
 
 
Control equipment and materials are selected to meet performance, budgetary and WHS/OHS requirements 
 
 
 
 
 
 
 
 
Inspections to validate natural gas or LPG system performance are undertaken to ensure compliance with job requirements and pressure and temperature control specifications, and documentation needed to complete the project is completed 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG118 - Select and commission equipment to meet pressure and temperature control specifications
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG118 - Select and commission equipment to meet pressure and temperature control specifications

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: