Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG136 Mapping and Delivery Guide
Carry out transmission pipeline construction work activities
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG136 - Carry out transmission pipeline construction work activities |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to carry out and complete gas transmission pipeline construction work activities in accordance with relevant legislation, industry standards, codes of practice and environmental, safety and workplace procedures.It includes working in a gas transmission construction environment, using the correct tools and equipment to conduct the activities and completing workplace documentation. Pipeline construction work may include slinging, welding, trenching, shoring, hydro testing, pipeline coating and coating testing, cathodic protection components and directional drilling.No licensing, legislative or certification requirements apply to this unit at the time of publication. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Transmission |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to carry out transmission pipeline construction work activities |
| |||||||
Element: Job requirements and workplace procedures for the site are obtained and discussed with relevant person/s to confirm the work schedule | ||||||||
Element: WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures | ||||||||
Element: Hazards are identified, risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Responsibility under the relevant work permit and/or relevant notification is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures | ||||||||
Element: Equipment, plant, tools and personal protective equipment (PPE) required for the transmission pipeline construction work are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures | ||||||||
Element: Relevant person/s are consulted to ensure the work is coordinated effectively with others involved | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for the transmission work activity are confirmed, scheduled and obtained in accordance with workplace procedures | ||||||||
Element: Site preparation, safety plans and work schedules are confirmed with relevant person/s in accordance with workplace procedures | ||||||||
Element: Carry out transmission pipeline construction work activity |
| |||||||
Element: Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job instructions | ||||||||
Element: Transmission pipeline construction is carried out to the required standard. without waste of materials or damage to apparatus, circuits, the surrounding environment or services using sustainable energy principles | ||||||||
Element: WHS/OHS risks and incidents are reported to authorised person/s for directions in accordance with workplace procedures | ||||||||
Element: Unplanned events are referred to authorised person/s for directions in accordance with workplace procedures | ||||||||
Element: Quality and safety checks of work are carried out in accordance with work instructions and workplace procedures | ||||||||
Element: Complete transmission pipeline construction activities |
| |||||||
Element: Work site is tidied and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Appropriate person/s are notified of work completion in accordance with workplace procedures | ||||||||
Element: Documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures |