Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG142 Mapping and Delivery Guide
Conduct isolations under the permit to work system for gas industry work sites
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG142 - Conduct isolations under the permit to work system for gas industry work sites |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to plan and conduct isolation, de-isolation and restoration under the permit to work system for a gas industry work site in accordance with relevant legislation, industry standards, codes of practice and workplace procedures. It includes conducting energy source isolation, de-isolation and restoration under permit to work system for a gas industry work site and completing relevant documentation.The application of the skills and knowledge described in this unit may require a license or permit to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Gas Cross Discipline |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for isolation work |
| |||||||
Element: Plans, specifications and instructions are obtained and interpreted to determine job requirements | ||||||||
Element: Job requirements and workplace procedures for the work are discussed with relevant person/s to confirm the work schedule and respective responsibilities | ||||||||
Element: Hazards are identified, WHS/OHS risks are assessed and control measures are prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Responsibilities under the relevant work permit/notification is obtained and confirmed to access, isolate/de-isolate systems and perform the work in accordance with regulatory requirements and workplace procedures | ||||||||
Element: Energy source isolation points are identified and communicated to the work party in accordance with requirements and workplace procedures | ||||||||
Element: Person/s and equipment, tools and personal protective equipment (PPE) required for the work are identified, coordinated, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures | ||||||||
Element: Resources, including persons and equipment required, are identified, scheduled, coordinated and confirmed | ||||||||
Element: Appropriate person/s are consulted to ensure the work is coordinated effectively with others involved | ||||||||
Element: Third-party issues, including low voltage electrical work, are referred to relevant person/s in accordance with workplace procedures | ||||||||
Element: Persons participating in the work, including plant operators and contractors, are briefed and responsibilities coordinated and authorised by permits to work, as required, in accordance with workplace procedures | ||||||||
Element: Site preparation, safety plan and the work schedule are confirmed in accordance with workplace procedures | ||||||||
Element: Conduct energy sourceisolation |
| |||||||
Element: Materials, tools, equipment, personal protective equipment (PPE) and measuring devices required for the isolation are selected and used correctly and safely in accordance with manufacturer instructions | ||||||||
Element: Work is carried out to industry standards without waste of materials or damage to apparatus, circuits and the surrounding environment or services using sustainable energy principles | ||||||||
Element: Hazard warnings and safety signs are recognised and WHS/OHS risks and incidents reported to authorised person/s for directions in accordance with workplace procedures | ||||||||
Element: Energy source isolation is completed, tagged, locked out and documented on work permit in accordance with workplace procedures and job requirements | ||||||||
Element: Unplanned events and non-routine problems encountered when conducting isolations are identified and actioned in accordance with requirements and workplace procedures | ||||||||
Element: Quality and safety checks of the work are undertaken in accordance with industry standards and workplace procedures | ||||||||
Element: Conduct de-isolation and restoration |
| |||||||
Element: De-isolation and restoration is performed, tags removed and results recorded in accordance with workplace procedures | ||||||||
Element: Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: De-isolations are confirmed with other person/s involved in, or affected by, the work in accordance with workplace procedures | ||||||||
Element: Work completion documentation, including relevant permits, are completed accurately and provided to appropriate person/s in accordance with workplace procedures |