Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEGNSG204 Mapping and Delivery Guide
Coordinate and conduct gas distribution pipeline repair and modifications

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG204 - Coordinate and conduct gas distribution pipeline repair and modifications
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to prepare, coordinate and conduct gas distribution pipeline repair and modifications. It includes on-the-job inspecting, testing, identifying, recommission the gas distribution pipeline, notifying relevant person/s of work completion, and completing documentation and reports in accordance with relevant industry standards and workplace procedures. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Gas Distribution
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for thecoordination of gas distribution pipeline repairs and modifications
  • Work schedule/s, drawings, plans, job requirements and material lists are obtained, analysed and confirmed, as required, by site inspection and identified repair/modification communicated to relevant person/s in accordance with workplace procedures
       
Element: Plans, specifications and other relevant information and workplace procedures for the work are obtained for all work sites and communicated to all relevant person/s in accordance with workplace procedures
       
Element: Work health and safety (WHS)/occupational health and safety (OHS) and environmental workplace policies and procedures related to the work are obtained and applied
       
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures
       
Element: Hazards are identified, WHS/OHS risks are assessed and control measures implemented in accordance with workplace procedures
       
Element: Relevant work permit/s are obtained to access, isolate/de-isolate systems and perform work in accordance with job requirements and workplace procedures
       
Element: Equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures
       
Element: Relevant persons at work site are confirmed to be current in first aid and other related requirements in accordance with work procedures
       
Element: Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures
       
Element: Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures
       
Element: Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures
       
Element: Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plan
       
Element: Coordinate and conductgaspipeline repair or modification
  • WHS/OHS and environmental risk control measures and policies and workplace procedures are followed
       
Element: Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures
       
Element: Gas distribution pipeline repair and modifications are coordinated to ensure completion in agreed timeframe and to required industry standards with a minimum of waste in accordance with job requirements and workplace procedures
       
Element: Coordination of gas distribution pipeline repair and modifications are carried out in accordance with the work schedule and workplace procedures
       
Element: Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised persons for directions in accordance with workplace procedures
       
Element: Pipeline repair/modification work is conducted and monitored and unplanned events, amendments and modifications in the pipeline repair are undertaken in accordance with workplace procedures
       
Element: Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
       
Element: Pipeline is inspected and tested and quality and safety checks of work undertaken in accordance with industry standards and workplace procedures
       
Element: Recommissiongasdistribution pipeline to operational conditionsand complete relevant documentation
  • System is recommissioned to meet distribution pipeline requirements and work undertaken is checked against work schedule for conformance and anomalies reported in accordance with workplace procedures
       
Element: Accidents and injuries are reported as required in accordance with workplace procedures
       
Element: Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures
       
Element: Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures
       
Element: Relevant work permit/s are signed off and pipeline is returned to service in accordance with job requirements and workplace procedures
       
Element: Records and drawings are updated to reflect repair, modifications and work completion records and reports as installed and relevant documentation completed, processed and appropriate person/s notified in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedule/s, drawings, plans, job requirements and material lists are obtained, analysed and confirmed, as required, by site inspection and identified repair/modification communicated to relevant person/s in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS and environmental risk control measures and policies and workplace procedures are followed 
 
 
 
 
 
 
 
System is recommissioned to meet distribution pipeline requirements and work undertaken is checked against work schedule for conformance and anomalies reported in accordance with workplace procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG204 - Coordinate and conduct gas distribution pipeline repair and modifications
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG204 - Coordinate and conduct gas distribution pipeline repair and modifications

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: