UEGNSG227 Mapping and Delivery Guide
Assist with the construction and laying of gas distribution mains

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG227 - Assist with the construction and laying of gas distribution mains
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to assist with constructing and laying gas distribution mains, and completing relevant documentation whilst working under supervision.It includes the use of relevant tools and equipment, and working safely in accordance with workplace procedures. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Gas Distribution
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to assist construction and laying gas distribution mains
  • Work health and safety (WHS)/occupational health and safety (OHS) and environmental workplace procedures and risk control measures for the site are identified and applied
       
Element: Job requirements and workplace procedures for the site are obtained and discussed with supervisor to confirm the work schedule
       
Element: Hazards are identified and reported to the supervisor to assess risks and control measures implemented in accordance with workplace procedures
       
Element: Scope of work and responsibility under the relevant work permit/notification is obtained and confirmed with supervisor in accordance with job requirements and workplace procedures
       
Element: Equipment, plant, tools and personal protective equipment (PPE) required to construct and lay gas distribution mains are identified, obtained and checked for operation and safety in accordance with workplace procedures
       
Element: Supervisor is consulted to ensure work is coordinated effectively with others involved
       
Element: Materials, plans, diagrams, drawings and resources required to construct and lay gas distribution mains are obtained in accordance with workplace procedures
       
Element: Safety and emergency procedures for an incident at the work site are checked and confirmed with supervisor
       
Element: Third-party issues are referred to supervisor as required in accordance with workplace procedures
       
Element: Site preparation, safety plan and work schedule are confirmed with supervisor in accordance with workplace procedures
       
Element: Assist in the construction and laying of gas distribution mains
  • WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed
       
Element: Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures
       
Element: Hazardous activities including lifting, climbing, using power tools, and working in excavations and trenches are conducted safely in accordance with WHS/OHS workplace procedures and job instructions
       
Element: Assistance in preparing and trenching the excavation for laying of pipe is provided in accordance with industry standards and workplace procedures
       
Element: Assistance in constructing and laying of gas distribution mains is provided in accordance with industry standards and workplace procedures
       
Element: Work is carried out to the required standard without waste of materials or damage to apparatus, equipment, and the surrounding environment or services using sustainable energy principles
       
Element: WHS/OHS risks, incidents, accidents and unplanned events are reported to the supervisor in accordance with workplace procedures
       
Element: Complete the work and relevant documentation
  • WHS/OHS and environmental risk control measures for work completion are followed
       
Element: Supervisor is notified of work completion in accordance with workplace procedures
       
Element: Tools, equipment and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures
       
Element: Work site is tidied and made safe in accordance with workplace procedures
       
Element: Relevant work documentation is completed and provided to the supervisor in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) and environmental workplace procedures and risk control measures for the site are identified and applied 
 
 
 
 
 
 
 
 
 
WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed 
 
 
 
 
 
 
WHS/OHS and environmental risk control measures for work completion are followed 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG227 - Assist with the construction and laying of gas distribution mains
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG227 - Assist with the construction and laying of gas distribution mains

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: