Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG229 Mapping and Delivery Guide
Prepare simple drawings of as laid gas mains and services
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG229 - Prepare simple drawings of as laid gas mains and services |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to produce drawings for as laid, new and altered gas installations, mains and services. It includes preparing drawings of newly constructed or altered pipework that is required to be recorded for future locating.This unit does not include complex drafting skills.No licensing, legislative or certification requirements apply to this unit at the time of publication. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Gas Distribution |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan to prepare simple drawings of as laid gas mains and services |
| |||||||
Element: Types of drawings required and key features, symbols and abbreviations for each type of plan and drawing used in the gas industry are identified in accordance with the scope and standard of work being undertaken | ||||||||
Element: Drawing requirements and needs are determined from work instructions and confirmed with relevant person/s in accordance with workplace procedures | ||||||||
Element: Client issues in relation to the drawing requirements are clarified and resolved in accordance with workplace procedures | ||||||||
Element: Equipment, tools and apparatus for producing drawings are identified, obtained and checked for correct operation prior to commencing work | ||||||||
Element: Prepare drawings of as laid gas mains and services |
| |||||||
Element: Starting point and cross reference points are established and measurements from the starting point, distances and off sets taken and recorded in accordance with job requirements and workplace procedures | ||||||||
Element: As laid pipework is drawn to scale on graph paper using industry standard drawing conventions in accordance with relevant codes and technical industry standards | ||||||||
Element: Fittings that effect the off-set or depth of the pipework, including elbows and tees, are indicated on the drawing as required | ||||||||
Element: Additional fittings that need to be recorded in line with drawing specifications, including in-line valves and tapping tees, are indicated on the drawing, as required | ||||||||
Element: All dimensions, including off-sets, distances, directions, pipe diameter, symbols and abbreviations are included on the drawing in accordance with job specifications and workplace procedures | ||||||||
Element: Standard drawing conventions are used to correct original job drawing to show final as laid arrangement in accordance with workplace procedures | ||||||||
Element: Quality and safety checks of work and testing of pipework is conducted in accordance with industry standards, work instructions and workplace procedures | ||||||||
Element: Complete work and relevant documentation |
| |||||||
Element: Drawings are finalised and signed off/closed in accordance with workplace procedures | ||||||||
Element: Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Appropriate person/s are notified of work completion in accordance with workplace procedures | ||||||||
Element: All drawings and forms are completed and submitted to appropriate person/s in accordance with workplace procedures |