Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEGNSG332 Mapping and Delivery Guide
Undertake hydro-testing for transmission pipeline construction

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG332 - Undertake hydro-testing for transmission pipeline construction
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to undertake hydro-testing on gas transmission pipelines at construction work sites, and complete hydro-testing activities and relevant documentation in accordance with relevant legislation, regulations, codes of practice and workplace procedures.It includes undertaking hydro-testing using the relevant equipment and plant, identifying safety and environmental hazards, and assessing risks associated with hydro-testing and exclusion zones.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Transmission
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for hydro-testing for transmission pipeline construction
  • Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
       
Element: Job requirements and workplace procedures for the site are obtained and discussed with relevant person/s to confirm the work schedule
       
Element: WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures
       
Element: Easement is inspected and testing procedures determined in accordance with workplace procedures and job requirements
       
Element: Recommendations to assist with testing of the construction pipeline are made to others involved in the work in accordance with workplace procedures
       
Element: Work site hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
       
Element: Scope of work and level of responsibility under the relevant work permit/authorisation is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures
       
Element: Tools, plant, equipment and personal protective equipment (PPE) required for the work are identified, scheduled, obtained and checked for operation and safety in accordance with workplace procedures and manufacturer instructions
       
Element: Materials, plans, diagrams, drawings and resources required for the work are confirmed, scheduled and obtained in accordance with workplace procedures
       
Element: Responsibilities for first aid, emergencies and other related work safety procedures for an incident at the work site are checked and confirmed with relevant person/s
       
Element: Third-party issues are referred to relevant person/s in accordance with workplace procedures
       
Element: Site preparation, safety plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures
       
Element: Hydro test transmission pipeline construction
  • WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed
       
Element: Materials, tools, plant, equipment and measuring devices required for the testing are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures
       
Element: Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job instructions
       
Element: Work area is isolated, made safe and hydro-testing of pipeline construction is carried out in accordance job instructions, industry standards and workplace procedures
       
Element: Hydro-testing of pipeline construction is conducted in agreed timeframe and to industry standards, without waste of materials or damage to apparatus, and the surrounding environment or services using sustainable energy principals
       
Element: WHS/OHS risks and incidents are reported to authorised person/s for directions in accordance with workplace procedures
       
Element: Unplanned events are referred to authorised person/s for directions in accordance with workplace procedures
       
Element: Remedial action required when hydro-testing transmission pipeline construction is dealt with in accordance with workplace procedures
       
Element: Quality and safety checks are carried out in accordance with work instructions and workplace procedures
       
Element: Complete hydro-testing activities and relevant documentation
  • WHS/OHS risk control measures for work completion are followed
       
Element: Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures
       
Element: Tools, equipment and any surplus resources and materials are, cleaned, checked and securely stored in accordance with workplace procedures
       
Element: Relevant person/s are notified of work completion in accordance with workplace procedures
       
Element: Work completion records, report forms and data sheets are completed accurately and provided to appropriate person/s in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures for work completion are followed 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG332 - Undertake hydro-testing for transmission pipeline construction
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG332 - Undertake hydro-testing for transmission pipeline construction

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: