Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG332 Mapping and Delivery Guide
Undertake hydro-testing for transmission pipeline construction
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG332 - Undertake hydro-testing for transmission pipeline construction |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to undertake hydro-testing on gas transmission pipelines at construction work sites, and complete hydro-testing activities and relevant documentation in accordance with relevant legislation, regulations, codes of practice and workplace procedures.It includes undertaking hydro-testing using the relevant equipment and plant, identifying safety and environmental hazards, and assessing risks associated with hydro-testing and exclusion zones.No licensing, legislative or certification requirements apply to this unit at the time of publication. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Transmission |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for hydro-testing for transmission pipeline construction |
| |||||||
Element: Job requirements and workplace procedures for the site are obtained and discussed with relevant person/s to confirm the work schedule | ||||||||
Element: WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures | ||||||||
Element: Easement is inspected and testing procedures determined in accordance with workplace procedures and job requirements | ||||||||
Element: Recommendations to assist with testing of the construction pipeline are made to others involved in the work in accordance with workplace procedures | ||||||||
Element: Work site hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Scope of work and level of responsibility under the relevant work permit/authorisation is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures | ||||||||
Element: Tools, plant, equipment and personal protective equipment (PPE) required for the work are identified, scheduled, obtained and checked for operation and safety in accordance with workplace procedures and manufacturer instructions | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for the work are confirmed, scheduled and obtained in accordance with workplace procedures | ||||||||
Element: Responsibilities for first aid, emergencies and other related work safety procedures for an incident at the work site are checked and confirmed with relevant person/s | ||||||||
Element: Third-party issues are referred to relevant person/s in accordance with workplace procedures | ||||||||
Element: Site preparation, safety plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures | ||||||||
Element: Hydro test transmission pipeline construction |
| |||||||
Element: Materials, tools, plant, equipment and measuring devices required for the testing are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job instructions | ||||||||
Element: Work area is isolated, made safe and hydro-testing of pipeline construction is carried out in accordance job instructions, industry standards and workplace procedures | ||||||||
Element: Hydro-testing of pipeline construction is conducted in agreed timeframe and to industry standards, without waste of materials or damage to apparatus, and the surrounding environment or services using sustainable energy principals | ||||||||
Element: WHS/OHS risks and incidents are reported to authorised person/s for directions in accordance with workplace procedures | ||||||||
Element: Unplanned events are referred to authorised person/s for directions in accordance with workplace procedures | ||||||||
Element: Remedial action required when hydro-testing transmission pipeline construction is dealt with in accordance with workplace procedures | ||||||||
Element: Quality and safety checks are carried out in accordance with work instructions and workplace procedures | ||||||||
Element: Complete hydro-testing activities and relevant documentation |
| |||||||
Element: Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and any surplus resources and materials are, cleaned, checked and securely stored in accordance with workplace procedures | ||||||||
Element: Relevant person/s are notified of work completion in accordance with workplace procedures | ||||||||
Element: Work completion records, report forms and data sheets are completed accurately and provided to appropriate person/s in accordance with workplace procedures |