UEGNSG333 Mapping and Delivery Guide
Work in proximity of transmission pipeline construction plant and equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG333 - Work in proximity of transmission pipeline construction plant and equipment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to work in proximity of gas transmission construction plant and equipment, and complete work and documentation in accordance with relevant legislations, codes of practice, regulations, industry standards and workplace procedures.It includes the operating parameters and safety issues of a range of specific plant and equipment dedicated to the construction of transmission pipelines at a construction work site.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Transmission
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to work in proximity of plant and equipment for transmission pipeline construction
  • Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
       
Element: Job requirements and workplace procedures for the site are obtained and discussed with relevant person/s to confirm the work schedule
       
Element: WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures
       
Element: Easement is inspected and assessed to determine relevant requirements in accordance with workplace procedures
       
Element: Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
       
Element: Scope of responsibility under the relevant work permit and/or relevant notification is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures
       
Element: Equipment, plant, tools and personal protective equipment (PPE) required for the work are identified, scheduled, obtained and checked for operation and safety in accordance with workplace procedures and manufacturer instructions
       
Element: Relevant person/s are consulted to ensure the work is coordinated effectively with others involved
       
Element: Materials, plans, diagrams, drawings and resources required for the work are confirmed, scheduled and obtained in accordance with workplace procedures
       
Element: Responsibilities for first aid, emergencies and work safety procedures for an incident at the worksite are checked and confirmed with relevant person/s
       
Element: Third-party issues are referred to relevant person/s in accordance with workplace procedures
       
Element: Site preparation, safety plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures
       
Element: Work in proximity of plant and equipment for transmission pipeline construction
  • WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed
       
Element: Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures
       
Element: Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job instructions
       
Element: Work is carried out to the required standard, without waste of materials or damage to apparatus, circuits, and the surrounding environment or services using sustainable energy principles
       
Element: WHS/OHS risks and incidents are reported to authorised person/s for directions in accordance with workplace procedures
       
Element: Unplanned events are referred to the authorised person/s for directions in accordance with workplace procedures
       
Element: Remedial action required when constructing pipeline easements is dealt with in accordance with workplace procedures
       
Element: Quality and safety checks are carried out in accordance with work instructions and workplace procedures
       
Element: Complete work and relevant documentation
  • WHS/OHS risk control measures for work completion are followed
       
Element: Work site is tidied and made safe in accordance with workplace procedures
       
Element: Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures
       
Element: Relevant person/s are notified of work completion in accordance with workplace procedures
       
Element: Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

backfilling must include at least one (1) of the following items of plant and equipment:

padding machine

excavator

grader

dozer

front end loader

clearing and grading must include at least one (l) of the following items of plant and equipment:

dozer

excavator

grader

backhoe

front end loader

ditching must include at least one (1) of the following items of plant and equipment:

excavator

rock saw

bucket wheel trencher

hydro-testing must include at least one (1) of the following items of plant and equipment:

crane truck

side boom

rough terrain crane

joint coating must include at least one (1) of the following items of plant and equipment:

sand blasting rig (skid steer)

over ditch wrapping machine

thermal coil

lowering and laying must include at least one (1) of the following items of plant and equipment:

side boom with roller cradles

excavator

performing mechanical (minor maintenance) must include at least four (4) of the following items of plant and equipment:

excavator and vacuum lift

bending machine and mandrels

internal line up clamp

tack rig

side boom

roller cradles

rock saw

bucket wheel trencher

thermal coil

over ditch wrapping machine

padding machines

mitsu bucket

stringing and bending must include at least one (1) of the following items of plant and equipment:

excavator

bending machine with mandrels

side boom

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed 
 
 
 
 
 
 
 
WHS/OHS risk control measures for work completion are followed 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG333 - Work in proximity of transmission pipeline construction plant and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG333 - Work in proximity of transmission pipeline construction plant and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: