Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEGNSG708 Mapping and Delivery Guide
Pressure test residential and small commercial gas installations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEGNSG708 - Pressure test residential and small commercial gas installations
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to pressure test residential and small commercial gas installations and associated components by a designated gas industry person in accordance with industry standards, regulations and workplace procedures.It includes using tools and testing equipment to pressure test the customer piping system, associated fittings and components, and completing required records and relevant documentation.The application of the skills and knowledge described in this unit may require a license or permit to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Support Services
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to pressure test gas installation
  • Work instructions are obtained and confirmed with relevant person/s in accordance with workplace procedures
       
Element: Job requirements and workplace procedures for the work are discussed with relevant person/s to confirm the work schedule
       
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy measures and workplace policies and procedures for the work are obtained and applied
       
Element: Equipment, tools and personal protective equipment (PPE) required for pressure testing are identified, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions
       
Element: Resources and materials required to carry out the pressure test are obtained in accordance with workplace procedures
       
Element: Client issues are referred to relevant person/s in accordance with industry standards and workplace procedures
       
Element: Work site is prepared, safety plan and work schedule confirmed with relevant person/s in accordance with workplace procedures
       
Element: Carry out pressure test of gas installation
  • WHS/OHS policies, procedures and safe work practices for the pressure test are followed to eliminate or minimise incidents and hazards
       
Element: Schedule of work is followed to ensure work is completed in agreed timeframe and to quality, safety and industry standards with a minimum of waste
       
Element: Conformance test is undertaken using correct tools and equipment in accordance with workplace procedures and industry standards
       
Element: Pressure test of the gas installation is undertaken using relevant pressure testing equipment in accordance with workplace procedures and regulatory requirements
       
Element: Customer piping system and associated components, including appliances, are pressure tested for conformance to industry standards and regulatory requirements
       
Element: Results of pressure test are analysed and non-compliant installations are disconnected in accordance with workplace procedures, industry standards and regulatory requirements
       
Element: Quality and safety checks of the work are undertaken in accordance with job instructions, industry standards and workplace procedures
       
Element: Complete pressure test and relevant documentation
  • WHS/OHS risk control measures for work completion are followed
       
Element: Final checks, including visual observation are undertaken to ensure quality of the work complies with industry standards, regulatory requirements and workplace procedures
       
Element: Relevant person/s are notified of work completion and non-conformances in accordance with workplace procedures
       
Element: Equipment, tools and any surplus materials or resources are cleaned, checked and returned to storage or disposed of in accordance with workplace procedures
       
Element: Work area is tidied and made safe in accordance with job instructions and workplace procedures and sustainable energy practices are followed
       
Element: Records and documentation are updated in accordance with job instructions and workplace procedures as required by the regulator
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions are obtained and confirmed with relevant person/s in accordance with workplace procedures 
 
 
 
 
 
 
WHS/OHS policies, procedures and safe work practices for the pressure test are followed to eliminate or minimise incidents and hazards 
 
 
 
 
 
 
WHS/OHS risk control measures for work completion are followed 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEGNSG708 - Pressure test residential and small commercial gas installations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEGNSG708 - Pressure test residential and small commercial gas installations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: