Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEGNSG807 Mapping and Delivery Guide
Install gas flow, measuring and pressure regulating devices
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEGNSG807 - Install gas flow, measuring and pressure regulating devices |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install gas flow, measuring and pressure regulating devices in accordance with relevant legislation, codes of practice, regulations and workplace procedures.It includes installing of gas valves, pressure controllers, regulators and meters in gas facilities and stations.This unit applies to the following types of gas stations, subject to all work health and safety (WHS)/occupational health and safety (OHS) and duty of care requirements being met for the workplace:pressure reduction stations, district and customer regulator setscompressor stationsmeter stations and customer meter setscustody transfer stationsinlets and city gatesscraper stationsgas storage facilitiesmain line valves.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 V a.c. or 120 V d.c. Competency development activities in this unit are subject to regulations directly related to licencing. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to WHS/ OHS regulations. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Pressure Control Discipline |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install gas flow, measuring and pressure regulating device |
| |||||||
Element: Work requirements are interpreted from plans, specifications and instructions | ||||||||
Element: Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s to determined and confirm work schedule and respective responsibilities | ||||||||
Element: WHS/OHS, environmental and sustainable energy workplace policies and procedures are determined and confirmed | ||||||||
Element: Hazards are identified, WHS/OHS risks are assessed and control measures are prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Scope of responsibility under the relevant work permits and/or relevant notification is determined and confirmed to access, isolate/de-energise systems and perform work in accordance with job requirements and workplace procedures | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) needed to carry out work activities are identified, scheduled, obtained and checked for correct operation and safety | ||||||||
Element: Appropriate persons are consulted to ensure work activity is coordinated effectively with person/s involved | ||||||||
Element: Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures | ||||||||
Element: Relevant responsibilities associated with first aid and related workplace safety procedures at the work site are identified, checked and confirmed | ||||||||
Element: Third-party issues are referred to appropriate person/s in accordance with workplace procedures | ||||||||
Element: Site preparation, safety plan and work schedule are confirmed in accordance with workplace procedures | ||||||||
Element: Install gas flow, measuring and pressure regulating device |
| |||||||
Element: Appropriate materials, tools, equipment and measuring devices are selected and used and safely in accordance with workplace procedures | ||||||||
Element: Hazardous activities are conducted safely in accordance with given safe work instructions and to job requirements | ||||||||
Element: Work is carried out efficiently, to required industry standard, without waste of materials or damage to apparatus, circuits, and the surrounding environment or services using sustainable energy principles | ||||||||
Element: Hazard warnings and safety signs are identified and assessed as part of WHS risks and incident control measures and are reported to authorised person/s for directions in accordance with workplace procedures | ||||||||
Element: Installation of components is conducted in accordance with work schedule and workplace procedures | ||||||||
Element: Gas flow regulator, filters and meter components system are purged, pressurised and checked for soundness in accordance with workplace procedures | ||||||||
Element: Non-routine/unplanned events are referred to the immediate authorised person/s for directions in accordance with workplace procedures | ||||||||
Element: Routine work activity quality checks are carried out in accordance with workplace instructions | ||||||||
Element: Complete work and relevant documentation |
| |||||||
Element: Work site is tidied and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources and materials are cleaned, checked and securely stored | ||||||||
Element: Appropriate person/s are notified of work completion in accordance with workplace procedures | ||||||||
Element: Work completion documentation is completed accurately and provided to appropriate persons in accordance with workplace procedures |