Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPMNT357B Mapping and Delivery Guide
Diagnose and repair faults in instrumentation equipment

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency UEPMNT357B - Diagnose and repair faults in instrumentation equipment
Description 1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to undertake to diagnose and repair instrumentation equipment, including, but not limited to, sensor elements, signal characterising equipment, input/output blocks, controllers, transducers and final elements.
Employability Skills 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.
Learning Outcomes and Application 2)This unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.Common Unit GroupUnit Code Unit TitleUEENEEI001B Install and set up transducers and sensing devicesUEENEEE002B Dismantle, assemble and fabricate electrotechnology componentsUEENEEE005B Fix and secure equipmentUEENEEE007B Use drawings, diagrams, schedules and manualsLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.Reading3Writing3Numeracy3
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for the work
  • Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection
  • Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
  • Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications
  • Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan
  • Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications
  • Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements
  • Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
  • Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
  • Work area is prepared in accordance with work requirements and site procedures
  • Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
       
Element: Verify the fault
  • Normal performance and function of the equipment is ascertained by consulting appropriate reference sources in accordance with the work plan
  • Fault indicators, appropriate technical information/diagnostic techniques are used to verify reported symptoms/faults in accordance with the work plan
  • Symptoms are reproduced and monitored if possible, whilst due regard for personnel safety and plant security is observed in accordance with the work plan
       
Element: Find the fault
  • Required isolations are confirmed where appropriate in accordance with site requirements
  • Fault finding is carried out in conjunction with others involved in or affected by the work in accordance with enterprise/job requirements
  • Equipment components, wires, cables, terminations and support fixings are inspected for obvious faults in accordance with the work plan
  • All appropriate fault finding/diagnostic techniques are identified, selected and used to determine the fault in accordance with the work plan
  • All appropriate components are disconnected to enable accurate test measurements of suspected faulty components without the concern of "back feed" readings in accordance with the work plan
  • Test and measurement instruments are used in accordance with manufacturer instructions and job requirements
       
Element: Determine cause of fault
  • All appropriate personnel are consulted in order to obtain as many details relating to the faulty equipment as possible in accordance with the work plan
  • Appropriate use is made of any information from fault indicators and maintenance records in accordance with the work plan
  • Valid conclusions about the nature and cause of the fault are reached from analysis of available evidence in accordance with the work plan
       
Element: Repair or rectify the fault
  • Required isolations are confirmed where appropriate in accordance with site requirements
  • Appropriate repair procedures are undertaken in conjunction with others involved in, or affected by, the work in accordance with the work plan
  • Faulty, worn, damaged or unsecured components are replaced, repaired or secured in accordance with the work plan
  • Parts and components are selected and replaced as required in accordance with appropriate specifications and the work plan
  • Components disconnected for testing are reconnected having been proven free of faults and all terminations are then checked to ensure they are electrically and mechanically sound in accordance with the work plan
  • All faults are repaired or rectified in accordance with the work plan
  • Final job inspection is performed and permits are relinquished as required in accordance with the work plan
       
Element: Complete the work
  • Work is completed and appropriate personnel notified in accordance with site/enterprise requirements
  • Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures
  • Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures
  • Work completion details are finalised in accordance with site/enterprise procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the range statement of the competency standard unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace, however, it must be in accord with Industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP12”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement

Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement

Demonstrate an understanding of the essential knowledge and associated skills as described in 6) Essential Knowledge and Associated Skills of this unit

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures

Demonstrated performance across a representative range of contexts from the prescribed items below:

The knowledge and application of relevant sections of: Occupational Health and Safety legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures

Preparation and planning of work

Verification techniques

Diagnostic and fault finding techniques and procedures

Repair techniques and procedures

Completion of work procedures

Dealing with an unplanned event by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working, in limited spaces, with different types of plant and equipment and different structural/ construction types and method and in a variety of environments.

Method of assessment

9.4)

This unit shall be assessed by methods given in Section 1.3.00 Assessment Guidelines.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed.

Nil


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired in diagnosing and repairing faults in instrumentation equipment.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PM357B Diagnose and repair faults in instrumentation equipment

T1 Evidence shall show that knowledge has been acquired for safe working practices of:

Relevant Environmental, Occupational Health and Safety legislation and regulations

Relevant plant and equipment, its location

Technical drawings and manufacturers manuals

Introduction to and typical arrangements of power production plant

Relevant state and territory regulations

Relevant Australian standards;

Equipment and material required to perform the work;

Isolation procedures;

Instrumentation principles and practices

Instrument calibration techniques

Fault finding and diagnostic techniques;

Repair techniques;

Instrumentation equipment;

Electrical fundamentals;

Test and measurement instruments;

Engineering and electronic workshop practice;

T2 Specific skills needed to achieve the Performance Criteria:

Apply Relevant Environmental, Occupational Health and Safety legislation and regulations

Interpret Technical drawings and manufacturers manuals

Apply relevant state and territory regulations

Apply relevant Australian standards;

Use tools and relevant equipment;

Use test and measurement instruments;

Verify and identify faults;

Use appropriate fault finding and diagnostic techniques;

Determine the cause of faults;

Repair faults;

Identify and select materials for the job;

Apply regulatory aspects theory;

Apply electrical fundamentals

Instrumentation principles and practices

Instrument calibration techniques

Carry out work completion details;

Communicate effectively;

Apply data analysis techniques and tools;

Apply engineering and electronic workshop practices

10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Inspection should be planned with the appropriate parties to determine access, conditions and work requirements.

Equipment may include gauges, transmitters, switches, thermocouples, RTD’s, thermostats, indicators, meters, proximity probes, indication slide wires, control valves, valve positioners, lock up valves, power cylinders, power cylinder positioners, I/P and E/P converters, air relays, pressure regulators, solenoid valves, analogue indicators, fire detectors, smoke detectors, vibration detectors, gas detectors and fuel valves.

Materials may include lubricants, cleaning solvents, gasket materials, leak test solution, connectors and fittings.

Components may include hair springs, gauge movements, pneumatic restrictors, air relays, microswitches, flapper/nozzles, diaphragms, springs, bellows, gaskets, shuttle valves, pilot valves, amplifier modules, coils and plug in printed circuit boards.

Test and measurement instruments may include dead weight tester, pneumatic calibrator, vacuum pump gauge, manometer, precision pressure gauge, hand-held pressure pump, comparator, temperature baths, oven, multimeter, variable power supply, d.c. I/V standard, potentiometer and decade box.

Fault finding and diagnostic techniques may include linear approach, half split rule, sensory detection, insulation/resistance and continuity tests.

Fault indicators may include indication lamps, LEDs, alarms and flag relays.

Work may be performed with equipment on line.

Work completion details may include plant and maintenance records, job cards, check sheets and on device labelling updates.

Work site environment may be affected by nearby plant or processes, e.g. heat, noise, dust, oil, water and chemical.

Isolations can refer to electrical/mechanical or other associated processes.

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1.00 Preliminary Information and Glossaries.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection 
Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure 
Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications 
Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan 
Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications 
Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements 
Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work 
Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures 
Work area is prepared in accordance with work requirements and site procedures 
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training 
Normal performance and function of the equipment is ascertained by consulting appropriate reference sources in accordance with the work plan 
Fault indicators, appropriate technical information/diagnostic techniques are used to verify reported symptoms/faults in accordance with the work plan 
Symptoms are reproduced and monitored if possible, whilst due regard for personnel safety and plant security is observed in accordance with the work plan 
Required isolations are confirmed where appropriate in accordance with site requirements 
Fault finding is carried out in conjunction with others involved in or affected by the work in accordance with enterprise/job requirements 
Equipment components, wires, cables, terminations and support fixings are inspected for obvious faults in accordance with the work plan 
All appropriate fault finding/diagnostic techniques are identified, selected and used to determine the fault in accordance with the work plan 
All appropriate components are disconnected to enable accurate test measurements of suspected faulty components without the concern of "back feed" readings in accordance with the work plan 
Test and measurement instruments are used in accordance with manufacturer instructions and job requirements 
All appropriate personnel are consulted in order to obtain as many details relating to the faulty equipment as possible in accordance with the work plan 
Appropriate use is made of any information from fault indicators and maintenance records in accordance with the work plan 
Valid conclusions about the nature and cause of the fault are reached from analysis of available evidence in accordance with the work plan 
Required isolations are confirmed where appropriate in accordance with site requirements 
Appropriate repair procedures are undertaken in conjunction with others involved in, or affected by, the work in accordance with the work plan 
Faulty, worn, damaged or unsecured components are replaced, repaired or secured in accordance with the work plan 
Parts and components are selected and replaced as required in accordance with appropriate specifications and the work plan 
Components disconnected for testing are reconnected having been proven free of faults and all terminations are then checked to ensure they are electrically and mechanically sound in accordance with the work plan 
All faults are repaired or rectified in accordance with the work plan 
Final job inspection is performed and permits are relinquished as required in accordance with the work plan 
Work is completed and appropriate personnel notified in accordance with site/enterprise requirements 
Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures 
Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures 
Work completion details are finalised in accordance with site/enterprise procedures 

Forms

Assessment Cover Sheet

UEPMNT357B - Diagnose and repair faults in instrumentation equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT357B - Diagnose and repair faults in instrumentation equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: