Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPMNT417B Mapping and Delivery Guide
Inspect electrical generators and diagnose faults

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency UEPMNT417B - Inspect electrical generators and diagnose faults
Description 1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to conduct inspections and diagnose faults in electrical generating sets.
Employability Skills 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.
Learning Outcomes and Application 2)This unit is intended to augment formally acquired competencies.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.Common Unit GroupUnit Code Unit TitleUEPMNT351B Test and commission electrical equipmentUEENEEG108A Trouble-shoot and repair faults in low voltage electrical apparatus and circuitsUEENEEE101A Apply Occupational Health Safety regulations, codes and practices in the workplace UEENEEE102A Fabricate, dismantle, assemble of utilities industry componentsUEENEEE104A Solve problems in d.c. circuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, cords and specificationsUEENEEG006A Solve problems in single and three phase low voltage machinesUEENEEG033A Solve problems in single and three phase low voltage electrical apparatus and circuitsUEENEEG063A Arrange circuits, control and protection for general electrical installationsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in low voltage a.c. circuitsUEENEEG106A Terminate cables, cords and accessories for low voltage circuitsLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.Reading4Writing4Numeracy4
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for the work
  • Maintenance and operating history is obtained
  • Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications and enterprise procedures are identified, applied and monitored throughout the inspection procedure
  • The inspection is planned in detail including sequencing, prioritising and considerations are made where appropriate of relevant technical and engineering procedures.
  • Resources required to satisfy the plan are identified, obtained and inspected for compliance with the job specifications
  • Relevant plans, drawings and texts are selected and interpreted in accordance with the plan
  • Co-ordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
  • Potential hazards are identified and prevention and/or control measures are selected in accordance with the inspection plan and site procedures
  • Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
       
Element: Carry out generator inspection
  • Required isolations are confirmed where appropriate in accordance with site requirements
  • Generator is inspected using appropriate manuals, drawings and texts in accordance with the plan
  • Generator is inspected in conjunction with others involved in, or affected by, the inspection plan
  • Any needs for additional tests/inspections required are defined
  • Inspection is carried out and permits relinquished in accordance with the plan
       
Element: Evaluate/analyse inspection results
  • Test/inspection results and data are analysed
  • Conclusions drawn with reference to potential options
  • Specialist assistance is sought when required
       
Element: Prepare remedial action plan
  • Action plan is prepared for any required remedial action
  • Remedial action is followed up and checked for effectiveness
       
Element: Update documentation
  • All relevant records and documentation are updated in accordance with statutory, industry and enterprise requirements
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this competency standard unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP12”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement

Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement

Demonstrate an understanding of the essential knowledge and associated skills as described in 6) of this unit

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures

Demonstrated performance across a representative range of contexts from the prescribed items below:

Preparation and planning of work

Inspection techniques and procedures

Working in a confined space

Analyse inspection results and make recommendations

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working, in limited spaces, with different types of plant and equipment as well as different structural/construction types and methods and in a variety of environments.

Method of assessment

9.4)

This unit shall be assessed by methods given in 1.3.00 Assessment Guidelines.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed.

UEPMNT421B Conduct technical inspection of process plant and equipment.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) This describes the Essential Skills and Knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired inspecting electrical generators and diagnosing faults.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PM417B Electrical generators and diagnose faults

T1 Evidence shall show that knowledge has been acquired for safe working practices of:

Relevant Environmental, Occupational Health and Safety legislation and regulations

Relevant plant and equipment, its location and operation

Technical drawings and manufacturers manuals

Introduction to and typical arrangements of power production plant

Relevant state and territory regulations

Relevant Australian standards

Isolation procedures

Generator types and characteristics

Generator support systems

Regulatory procedures

Engineering and workshop practice

T2 Specific skills needed to achieve the Performance Criteria:

Apply Relevant Environmental, Occupational Health and Safety legislation and regulations

Interpret Technical drawings and manufacturers manuals

Apply relevant state and territory regulations

Apply relevant Australian standards

Use inspection procedures

Apply data analysis techniques and tools

Communicate effectively.

10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Details of inspection may be clarified by diagnosis of operational information.

Inspection may include windings, end windings and connections, slot wedges, insulation, end bell, excitation systems, automatic voltage regulator and cooling system.

Inspection completion details may include plant and maintenance records, job cards, check sheets and on device labelling updates.

Work site environment may be affected by nearby plant or processes, e.g. heat, noise, dust, oil, water and chemical.

Isolations can refer to electrical/mechanical or other associated processes.

Tests may include visual and sensory, sampling, tensioning and leak testing.

Faults identified may include movement of conductors, leaks in stator cooling systems, movement of connections and build up of foreign matter.

Appropriate personnel for consultation may include supervisor/team leader or equivalent, technical and engineering officers or equivalent, maintenance staff, power plant operations personnel and external specialist personnel.

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Maintenance and operating history is obtained 
Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications and enterprise procedures are identified, applied and monitored throughout the inspection procedure 
The inspection is planned in detail including sequencing, prioritising and considerations are made where appropriate of relevant technical and engineering procedures. 
Resources required to satisfy the plan are identified, obtained and inspected for compliance with the job specifications 
Relevant plans, drawings and texts are selected and interpreted in accordance with the plan 
Co-ordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work 
Potential hazards are identified and prevention and/or control measures are selected in accordance with the inspection plan and site procedures 
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training 
Required isolations are confirmed where appropriate in accordance with site requirements 
Generator is inspected using appropriate manuals, drawings and texts in accordance with the plan 
Generator is inspected in conjunction with others involved in, or affected by, the inspection plan 
Any needs for additional tests/inspections required are defined 
Inspection is carried out and permits relinquished in accordance with the plan 
Test/inspection results and data are analysed 
Conclusions drawn with reference to potential options 
Specialist assistance is sought when required 
Action plan is prepared for any required remedial action 
Remedial action is followed up and checked for effectiveness 
All relevant records and documentation are updated in accordance with statutory, industry and enterprise requirements 

Forms

Assessment Cover Sheet

UEPMNT417B - Inspect electrical generators and diagnose faults
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT417B - Inspect electrical generators and diagnose faults

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: