Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPMNT421 Mapping and Delivery Guide
Conduct technical inspection of process plant and equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPMNT421 - Conduct technical inspection of process plant and equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to conduct a technical inspection of process generation plant, equipment and associated infrastructure.An inspection is an organised examination or formal evaluation of power generation plant and equipment, it includes verifying compliance with technical specifications, taking measurements and performing tests.Competency in this unit requires the ability to prepare for an inspection of power generation plant,inspection of power generation plant, analysing inspection resultsand updating documentation. Individuals will, in general, work as a maintenance operative in a power generation facility. Power generation maintenance personnel are typically trained and authorised to receive permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Inspect process plant |
| |||||||
Element: Update documentation |
| |||||||
Element: Prepare for inspection processplant |
| |||||||
Element: Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications and workplace procedures are reviewed in preparation for work | ||||||||
Element: Deviations from normal operational parameters of process plant, equipment and associated infrastructure are identified | ||||||||
Element: Potential options for cause of deviations are established, in accordance with workplace procedures | ||||||||
Element: Needs and outcomes of process plant inspections or testing are defined, in accordance with workplace procedures | ||||||||
Element: Method sheets, check sheets and isolation instructions are obtained, in accordance with workplace procedures | ||||||||
Element: Technical procedures are reviewed and adapted, as required, in accordance with workplace procedures |
| |||||||
Element: Process plant's operational status is identified, in accordance with workplace procedures | ||||||||
Element: Inspection work is carried out, in accordance with workplace procedures, legislative requirements and industry standards | ||||||||
Element: Inspection methods are followed, in accordance with workplace procedures | ||||||||
Element: Relevant documentation is completed, in accordance with workplace procedures | ||||||||
Element: Additional tests or inspections are identified, in accordance with workplace procedures | ||||||||
Element: Process plant and/or equipment is left in a safe condition, in accordance with workplace procedures | ||||||||
Element: Process plant and/or equipment availability is declared, in accordance with workplace procedures | ||||||||
Element: Specialist assistance is sought, in accordance with workplace procedures, during a technical inspection | ||||||||
Element: Analyse inspection results |
| |||||||
Element: Causes for deviations from normal operation are identified | ||||||||
Element: Prepare remedial action plan |
| |||||||
Element: Remedial action is checked for implementation effectiveness, in accordance with workplace procedures |
| |||||||
Element: Testing and inspection results, including reports are forwarded to designated personnel |