UEPMNT422 Mapping and Delivery Guide
Conduct performance testing on process plant and equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEPMNT422 - Conduct performance testing on process plant and equipment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to conduct performance testing on process plant and equipment. Performance testing is used to determine how power generation plant and equipment performs in terms of responsiveness and stability under specified workloads. It can also serve to investigate, measure, validate or verify other attributes such as scalability, reliability and resource usage.Competency in this unit requires the ability to plan and prepare for performance tests, undertake performance tests and collect data, evaluate and analyse informationand complete documentation. Individuals will, in general, work as a maintenance operative in a power generation facility. Power generation maintenance personnel are typically trained and authorised to receive permits to work. No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Maintenance
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for performance test
  • Work request is received and appropriate method of testing is determined, in accordance with legislative requirements, industry standards and workplace procedures
       
Element: Safety and process plant issues are identified, in accordance with workplace procedures
       
Element: Specialist assistance and personnel are arranged, in accordance with workplace procedures
       
Element: Tools and equipment are identified and acquired, in accordance with workplace procedures
       
Element: Test equipment is calibrated as specified in industry standards, manufacturers' specifications and workplace procedures
       
Element: Performance test requirements are determined and planned, in accordance with manufacturers' specifications and workplace procedures
       
Element: Process plant is identified and its' status prior to the test is established, in accordance with workplace procedures and from appropriate personnel
       
Element: Authority to carry out work is obtained, in accordance with workplace procedures, process plant operating conditions and load requirements
       
Element: Undertakeperformance test and collect data
  • Process plant is coordinated to initial operating state, ready for testing, in accordance with workplace procedures
       
Element: Performance tests and data collection are undertaken using appropriate techniques that ensure personnel safety and process plant integrity
       
Element: Performance tests are carried out, in accordance with workplace procedures
       
Element: Data is collected, in accordance with workplace procedures
       
Element: Performance test results are evaluated to accurately assess performance of process plant
       
Element: Process plant availability is declared, on completion of tests, in accordance with workplace procedures
       
Element: Evaluate and analyse information
  • Process plant efficiency is evaluated, and analysed, in accordance with workplace procedures using data collected
       
Element: Process plant performance is measured against criteria or specifications, in accordance with workplace procedures
       
Element: Cause of abnormal process plant performance is identified by analysing technical and operational information
       
Element: Process plant integrity is maintained through consultation with appropriate personnel and reference to technical and operational documentation
       
Element: Performance test data is critiqued and validated, referencing technical information and applicable test procedure documentation
       
Element: Complete documentation
  • Information and data is collated, in accordance with workplace procedures
       
Element: Reports and documentation are produced, in accordance with workplace procedures
       
Element: Reports and documentation are presented to appropriate personnel, in accordance with workplace procedures, to facilitate implementation of recommendations
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work request is received and appropriate method of testing is determined, in accordance with legislative requirements, industry standards and workplace procedures 
 
 
 
 
 
 
 
Process plant is coordinated to initial operating state, ready for testing, in accordance with workplace procedures 
 
 
 
 
 
Process plant efficiency is evaluated, and analysed, in accordance with workplace procedures using data collected 
 
 
 
 
Information and data is collated, in accordance with workplace procedures 
 
 

Forms

Assessment Cover Sheet

UEPMNT422 - Conduct performance testing on process plant and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT422 - Conduct performance testing on process plant and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: