Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPMNT447A Mapping and Delivery Guide
Diagnose and repair faults in wind turbine generator electrical systems
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UEPMNT447A - Diagnose and repair faults in wind turbine generator electrical systems |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to diagnose and repair faults in large scale wind turbine generator (WTG) electrical systems. | ||
Employability Skills | 5) This unit contains Employability Skills.The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must have been completed.Common Unit GroupUnit Code Unit TitleUEPMNT371A Maintain large scale wind turbine generatorsUEPMNT442A Maintain wind turbine generator electrical systemsUEPMNT445A Diagnose and repair faults in large scale wind turbine generatorsUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, dismantle, assemble of electrotechnology componentsUEENEEE104A Solve problems in d.c circuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specifications UEENEEG006A Solve problems in single and three phase low voltage machinesUEENEEG033A Solve problems in single and three phase low voltage electrical apparatus and circuitsUEENEEG063A Arrange circuits, control and protection for general electrical installationsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in low voltage a.c. circuitsUEENEEG106A Terminate cables, cords and accessories for low voltage circuitsUEENEEG108A Trouble-shoot and repair faults in low voltage electrical apparatus and circuitsLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.Reading4Writing4Numeracy4 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Gather data |
| |||||||
Element: Interpret data to establish hypothesis in regards to WTG electrical system fault |
| |||||||
Element: Repair WTG electrical system fault |
| |||||||
Element: Record WTG electrical system fault |
|