UEPOPS411B Mapping and Delivery Guide
Run up a steam turbine
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | UEPOPS411B - Run up a steam turbine |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to conduct a steam turbine run up to a stable operating condition. | ||
Employability Skills | 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.There are no pre-requisite units.Literacy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.Reading4Writing4Numeracy4 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Run up steam turbine |
| |||||||
Element: Plant is monitored and observed to detect deviations from normal operating conditions |
| |||||||
Element: Corrective actions are taken to rectify abnormalities in accordance with manufacturer’s and enterprise/site procedures | ||||||||
Element: Generator is synchronised and connected to the electrical system in accordance with enterprise and manufacturer operating procedures | ||||||||
Element: Test plant operation |
| |||||||
Element: Analyse system faults |
| |||||||
Element: Complete documentation |
|