Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEPOPS441 Mapping and Delivery Guide
Operate and monitor system equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEPOPS441 - Operate and monitor system equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to operate, monitor and control High Voltage (H.V.) apparatus on the system via SCADA control.Supervisory Control and Data Acquisition(SCADA) is acontrol systemthat uses computers, networked data communications andgraphic interfaces.It uses other peripheral devices such asprogrammable logic controllersand discreteproportional integral derivative controllers to interface with plant, equipment or machinery.Competency in this unit requires the ability to plan work, operate system equipment, monitor system equipment, analyse system equipment faults and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Operations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: System and/or network requirements for operating, monitoring and controlling H.V. apparatus through SCADA are identified from appropriate personnel and documentation, in accordance with workplace procedures | ||||||||
Element: System and/or network and associated H.V. apparatus and SCADA equipment operational prerequisites are identified and established, in accordance with workplace and manufacturers' procedures | ||||||||
Element: Sequence for recommissioning of system and/or network H.V. apparatus and equipment through SCADA is identified and determined, in accordance with workplace procedures | ||||||||
Element: Operate system/network equipment |
| |||||||
Element: Load shedding requirements are identified, selected and monitored, in accordance with workplace procedures, during equipment operations to ensure system integrity | ||||||||
Element: System and/or network operations are completed in consultation with appropriate personnel | ||||||||
Element: Monitor system/network equipment |
| |||||||
Element: System and/or network equipment is monitored for normal operations or to detect deviations, in accordance with workplace procedures | ||||||||
Element: Corrective actions to rectify system and/or network abnormalities are taken, in accordance with workplace procedures | ||||||||
Element: Appropriate personnel are notified when system and/or network equipment defects or abnormal operating conditions are detected, in accordance with workplace procedures | ||||||||
Element: Analyse system/networkequipment faults |
| |||||||
Element: Operation of protection system is identified and assessed, in accordance with workplace procedures, to evaluate nature and cause of fault conditions | ||||||||
Element: Communication is established with key stakeholders, in accordance with workplace procedures, to identify nature and source of equipment system fault or failure | ||||||||
Element: Corrective action is taken, in accordance with workplace procedures | ||||||||
Element: Network and/or system integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel technical and operational documentation including contingency plans | ||||||||
Element: Complete documentation |
| |||||||
Element: Documentation is updated, in accordance with workplace procedures |