Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEPOPS509B Mapping and Delivery Guide
Manage quality control procedures

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency UEPOPS509B - Manage quality control procedures
Description 1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to manage quality control procedures.
Employability Skills 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.
Learning Outcomes and Application 2)This unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.There are no pre-requisite units.Literacy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.Reading5Writing5Numeracy5
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan for quality control
  • Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
  • Specifications are interpreted to meet customer need in accordance with standard procedures
  • Products/work is tested or inspected to determine conformance with specifications
  • Data is analysed and relevant information used to determine cause of quality variations
  • Analytical process improvement tools are used to identify and solve quality problems
  • Knowledge of process improvement techniques are used to facilitate work groups to assist in the identification and resolution of quality variances
  • Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
       
Element: Monitor quality control
  • Monitoring equipment is checked for correct calibration and environmental conditions confirmed to ensure reliability and accuracy of tests and results
  • Quality control process improvement measures are implemented and monitored in accordance with standard operating procedures
  • Deviation and fault data is collected and interpreted in accordance with standard operating procedures
  • Changes in quality performance is noted and further action recommended where required in accordance with standard operating procedures
  • Independent inspection, tests and audits are conducted, and design and servicing process monitored
  • Quality improvement system is monitored and maintained in accordance with standard operating procedures
       
Element: Complete documentation
  • Calibration records of test equipment maintained in accordance with standard operating procedures
  • Updates of quality control process procedures are maintained in accordance with standard operating procedures
       
Element: Audit quality control procedures
  • The quality system is audited, and results are evaluated in accordance with enterprise procedures
  • Audit results are documented and reports/recommendations are confirmed with the appropriate personnel
  • Recommendations relating to audit results are documented and confirmed with the appropriate personnel and in accordance with enterprise procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the range statement of the competency standard unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP12”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement

Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement

Demonstrate an understanding of the essential knowledge and associated skills as described in 6) of this unit

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures

Demonstrated performance across a representative range of contexts from the prescribed items below:

Knowledge and application of relevant sections of: OHS legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures

Application of quality control procedures, processes and techniques

Using specifications and manuals

Audit of Quality Procedures

Dealing with an unplanned event by drawing on Essential Knowledge and Skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this competency standard unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working, in limited spaces, with different types of plant and equipment as well as different structural/construction types and methods and in a variety of environments.

Method of assessment

9.4)

This unit shall be assessed by methods given in Section 1.3.00 Assessment Guidelines.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the Essential Knowledge and Skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed

Nil


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired managing quality control procedures.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PO509B Quality control procedures

T1 Evidence shall show that knowledge has been acquired for safe working practices of:

Relevant environmental, occupational health and safety legislation and regulations

Enterprise procedures

Plant drawings and manufacturers manuals

Introduction to and typical arrangements of power production plant

Relevant plant and equipment, its location and operating parameters

Interpersonal skills techniques

Stakeholder management techniques

Time management techniques

Leadership techniques

Liaising with contractors and clients

Project management techniques

Relevant international and Australian standards,

Quality control procedures, processes and techniques

Statistical analysis

Monitoring equipment

Inspection techniques

Data analysis

T2 Specific skills needed to achieve the performance criteria:

Interpret plant drawings and manufacturers manuals

Apply relevant international and Australian standards, statutory requirements and codes of practice

Apply quality control procedures, processes and techniques

Monitor quality control processes and techniques

Perform statistical analysis

Conduct inspections

Identify variances to specifications

Communicate effectively.

10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Quality assurance and quality control standards may refer to international and Australian standards.

Customers may be internal or external.

Audit refers to internal audits.

Monitoring equipment may include precision measuring instrument such as micrometers, multimeter, oscilloscope and vernier callipers, pressure and temperature indicators/recorders and vibration monitors/recorders.

Environmental conditions may be affected by nearby plant or processes.

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure 
Specifications are interpreted to meet customer need in accordance with standard procedures 
Products/work is tested or inspected to determine conformance with specifications 
Data is analysed and relevant information used to determine cause of quality variations 
Analytical process improvement tools are used to identify and solve quality problems 
Knowledge of process improvement techniques are used to facilitate work groups to assist in the identification and resolution of quality variances 
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training 
Monitoring equipment is checked for correct calibration and environmental conditions confirmed to ensure reliability and accuracy of tests and results 
Quality control process improvement measures are implemented and monitored in accordance with standard operating procedures 
Deviation and fault data is collected and interpreted in accordance with standard operating procedures 
Changes in quality performance is noted and further action recommended where required in accordance with standard operating procedures 
Independent inspection, tests and audits are conducted, and design and servicing process monitored 
Quality improvement system is monitored and maintained in accordance with standard operating procedures 
Calibration records of test equipment maintained in accordance with standard operating procedures 
Updates of quality control process procedures are maintained in accordance with standard operating procedures 
The quality system is audited, and results are evaluated in accordance with enterprise procedures 
Audit results are documented and reports/recommendations are confirmed with the appropriate personnel 
Recommendations relating to audit results are documented and confirmed with the appropriate personnel and in accordance with enterprise procedures 

Forms

Assessment Cover Sheet

UEPOPS509B - Manage quality control procedures
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS509B - Manage quality control procedures

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: