UEPOPS513B Mapping and Delivery Guide
Manage operational crisis to maintain_restore power system integrity

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency UEPOPS513B - Manage operational crisis to maintain_restore power system integrity
Description 1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to manage a crisis of a magnitude which affects the integrity and effectiveness of the system.
Employability Skills 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.
Learning Outcomes and Application 2)This unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.There are no pre-requisite units.Literacy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following levels. A description of what each level entails is provided in Section 2.3.1 Language, Literacy and Numeracy.Reading5Writing5Numeracy5
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Identify crisis
  • Crisis and probable implications are identified and assessed in accordance with enterprise procedures
  • Secondary threats to situation are identified and monitored in accordance with enterprise procedures
  • The system configuration and/or generation capability is evaluated in accordance with enterprise procedures
  • Data determining network/system and/or generation status is assessed and evaluated in accordance with enterprise procedures
  • External information is received, collated and assessed in accordance with enterprise procedures
  • Probable cause of crisis is identified from available information and resources
  • Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
       
Element: Establish contingency plan
  • Contingency plans are identified using relevant enterprise documentation and procedures
  • Requirements for additional resources are identified in accordance with enterprise procedures
  • Alternate contingencies to cater for crisis variations are developed in consultation with team members
       
Element: Establish communications
  • Communication links with appropriate external authorities for coordination of their resources are established in accordance with enterprise procedures
  • Communication with appropriate key stake holders is established to disseminate information in accordance with enterprise procedures
  • Customers are dealt with in accordance with enterprise policy and procedure
  • Team roles, both internal and external, are identified and conveyed to appropriate personnel in accordance with enterprise procedures
       
Element: Manage crisis
  • Response is managed in accordance with enterprise/site requirements and allowances for personnel/equipment limitations are made
  • Events and responses are prioritised taking into account needs of stake holders in accordance with enterprise procedures
  • Impact of secondary threats are identified and assessed in accordance with enterprise procedures
  • Contingency plans are actioned in accordance with enterprise/site policy and procedure
  • Additional resources are coordinated and directed in accordance with enterprise procedures
  • Restoration strategies are monitored, evaluated and adjusted as necessary in accordance with enterprise procedures
  • Systems are stabilised and integrity maintained in accordance with enterprise procedures
       
Element: Document and review crisis and response
  • Equipment failure/problems are recorded and processed in accordance with enterprise procedures
  • Feedback from stake holders is recorded and analysed in accordance with enterprise procedures
  • Required reports and findings are generated and distributed to appropriate personnel in accordance with enterprise procedures
  • Improvements to the crisis management process are recommended to the appropriate parties in accordance with enterprise procedures
  • Alternative contingencies are analysed and recommendations are communicated to appropriate personnel in accordance with enterprise procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the range statement of the competency standard unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP12”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement

Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement

Demonstrate an understanding of the essential knowledge and associated skills as described in 6) of this unit

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures

Demonstrated performance across a representative range of contexts from the prescribed items below:

Knowledge and application of relevant sections of: Occupational Health and Safety legislation; Statutory legislation; Enterprise/site safety procedures; Enterprise/site emergency procedures

Knowledge of emergency procedures

Knowledge of the roles of external authorities/bodies

Ability to establish and control emergency situations

Ability to apply tactical decision making techniques

Dealing with an unplanned event by drawing on Essential Knowledge and Skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this competency standard unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working, in limited spaces, with different types of plant and equipment as well as different structural/construction types and methods and in a variety of environments.

Method of assessment

9.4)

This unit shall be assessed by methods given in Section 1.3.00 Assessment Guidelines.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the Essential Knowledge and Skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed

Nil


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired managing operational crisis to maintain / restore power system integrity.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PO513B Operational crisis to maintain/restore power system integrity

T1 Evidence shall show that knowledge has been acquired for safe working practices of:

Relevant environmental, occupational health and safety legislation and regulations

Enterprise procedures

Plant drawings and manufacturers manuals

Introduction to and typical arrangements of power production plant

Relevant plant and equipment, its location and operating parameters

Interpersonal skills techniques

Stakeholder management techniques

Leadership techniques

Liaising with contractors and clients

Plant status

Enterprise recording procedures

Supervisory, alarm, protection and control equipment

Computers and software

Communication equipment

Communication principles

T2 Specific skills needed to achieve the performance criteria:

Interpret plant drawings and manufacturers manuals

Apply relevant statutory legislation

Apply relevant enterprise/site safety procedures

Apply enterprise/site emergency procedures and techniques

Apply enterprise recording procedures

Apply relevant state and territory regulations

Apply enterprise recording procedures

Identify plant status

Communicate effectively

Apply diagnostic techniques

Apply data analysis techniques and tools

Recognise abnormal plant operating conditions

Apply or determine appropriate corrective actions required

Plan and prioritise work

Interpret remote indication of plant status and condition

Delegate to and manage staff

Apply stress management techniques.

10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Safety standards may include relevant sections of Occupational Health and Safety legislation, relevant state and federal legislation, national standards for plant and enterprise safety rules

Information and documentation sources may include verbal or written communications; enterprise safety rules documentation; enterprise operating instructions; dedicated computer equipment; enterprise/site standing and operating instructions; enterprise log books; manufacturer’s operation and maintenance manuals; equipment and alarm manuals and external stake holder agreements

Communications may be by means of telephone, two way radio, pager, computer (electronic mail), operating logs (written or verbal) and intercoms

Appropriate personnel for consultation, to give or receive direction may include supervisor/team leader or equivalent, power plant operations personnel or equivalent, technical and engineering officers or equivalent, maintenance staff, power plant operations personnel, police, fire brigade, ambulance, emergency services, interconnected equipment personnel, public relations, management and system/network controllers

Operating environment may be remote from plant and equipment being operated (operation is assisted by remote indicators of plant status and other parameters monitored) during inclement or otherwise harsh weather conditions, in wet/noisy/dusty areas, during night periods, continuous operation, during periods of stress, fatigue, work pressures, external influence (plant and people) and during high level intense work environment

Types of incidents may include blackout, interconnected/isolated power system potential power system threat, disasters, accident, life threatening situations, generation plant and auxiliary plant faults/failures, system blacks, cyclone, multiple faults, floods, secondary threats, high winds and extreme electrical storms

Key indicators are voltage, current, reactive power flows, load, equipment, loading limits, system node points and appropriate external indicators, e.g. radar

System implications are machine and system stability, transmission line and transformer overloading, correct tap changer position, protection settings, voltage transformer selection, synchronising, required load shedding selected and capacitor/confessor bank selection

System conditions may be: voltage profiles, spare plant, generation/transmission capability limits, variation from normal trends and switching

Documentation may include policy, procedure, standard operating instructions, contingency plans and emergency switching programs

Liaison with key stake holders may be system/network controllers/coordinators, oncoming shift change, field operators, support staff, asset centres, patrolmen, customers, other government bodies, co-generation authorities, generation plant operators, on call staff, police, fire, emergency services, private systems and independent power producers

Post incident debrief may be probable fault/failure cause, strategic/contingency plan, environmental implications, economic factors, policy, procedure, training, safety factors and emergency switching programs

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Crisis and probable implications are identified and assessed in accordance with enterprise procedures 
Secondary threats to situation are identified and monitored in accordance with enterprise procedures 
The system configuration and/or generation capability is evaluated in accordance with enterprise procedures 
Data determining network/system and/or generation status is assessed and evaluated in accordance with enterprise procedures 
External information is received, collated and assessed in accordance with enterprise procedures 
Probable cause of crisis is identified from available information and resources 
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training 
Contingency plans are identified using relevant enterprise documentation and procedures 
Requirements for additional resources are identified in accordance with enterprise procedures 
Alternate contingencies to cater for crisis variations are developed in consultation with team members 
Communication links with appropriate external authorities for coordination of their resources are established in accordance with enterprise procedures 
Communication with appropriate key stake holders is established to disseminate information in accordance with enterprise procedures 
Customers are dealt with in accordance with enterprise policy and procedure 
Team roles, both internal and external, are identified and conveyed to appropriate personnel in accordance with enterprise procedures 
Response is managed in accordance with enterprise/site requirements and allowances for personnel/equipment limitations are made 
Events and responses are prioritised taking into account needs of stake holders in accordance with enterprise procedures 
Impact of secondary threats are identified and assessed in accordance with enterprise procedures 
Contingency plans are actioned in accordance with enterprise/site policy and procedure 
Additional resources are coordinated and directed in accordance with enterprise procedures 
Restoration strategies are monitored, evaluated and adjusted as necessary in accordance with enterprise procedures 
Systems are stabilised and integrity maintained in accordance with enterprise procedures 
Equipment failure/problems are recorded and processed in accordance with enterprise procedures 
Feedback from stake holders is recorded and analysed in accordance with enterprise procedures 
Required reports and findings are generated and distributed to appropriate personnel in accordance with enterprise procedures 
Improvements to the crisis management process are recommended to the appropriate parties in accordance with enterprise procedures 
Alternative contingencies are analysed and recommendations are communicated to appropriate personnel in accordance with enterprise procedures 

Forms

Assessment Cover Sheet

UEPOPS513B - Manage operational crisis to maintain_restore power system integrity
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS513B - Manage operational crisis to maintain_restore power system integrity

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: