Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRCJ12B Mapping and Delivery Guide
stall and maintain oil and gas pressure systems for specialised underground cables
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRCJ12B - stall and maintain oil and gas pressure systems for specialised underground cables |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the installation, maintenance and repair of oil and gas pressure systems for specialised underground cables. It includes the undertaking of pressure control activities, the installation of gauges, oil tanks and gas cubicles. It also includes the knowledge of Oil Route Profiles as well as the operation of pressure equipment for jointing works, and the repairing and replacing of pressure systems. It also encompasses the procedures associated with performing accessory impregnation, oil flow testing, the processes for oil degasification and performing leak location of pressure systems. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CSU(s): CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRCJ03B Install and maintain de-energised HV underground paper insulated cables and UETTDRCJ07B Install and maintain de-energised HV underground polymeric cables For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare/Plan to install and maintain oil and gas pressure systems for specialised underground cables |
| |||||||
Element: Carry out the installation and maintenance of oil and gas pressure systems for specialised underground cables |
| |||||||
Element: Complete the installation and maintenance of oil and gas pressure systems for specialised underground cables |
|