Install gas and oil filled specialised underground cables

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency UETTDRCJ29A - Install gas and oil filled specialised underground cables
Description 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the installation, jointing and termination of oil and gas filled specialised underground cables from 33kV and higher. It includes the laying of the specialised underground ground cable, the preparation of the cables and phasing out jointing and terminating and the preparation of the cable jointing bay. It also encompasses the relevant safety procedures to ensure installation of the specialised cable is undertaken according to established enterprise requirements.
Employability Skills 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.
Learning Outcomes and Application 2)This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):Common Unit GroupUnit Code Unit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE104A Solve problems in d.c. CircuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in low voltage a.c. CircuitsUETTDRCJ21A Lay ESI electrical cables UETTDRCJ23A Install and maintain de-energised high voltage underground paper insulated cables.UETTDRCJ26A Install and maintain de-energised low voltage underground polymeric cables. UETTDRCJ27A Install and maintain de-energised high voltage underground polymeric cables. UETTDRCJ99A Test and verify distribution cable jointing installationsUETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDREL16A Working safely near live electrical apparatus UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS55A Install and maintain low voltage underground services Literacy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”.Reading4Writing4Numeracy4
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare/Plan to install oil and gas filled specialised underground cables
  • Works schedule(s), including drawings, plans, requirements, established procedures, and material lists, are obtained, analysed, if necessary, by site inspection and the extent of the preparation of the work determined for planning and coordination.
  • Relevant requirements and established procedures for the work are communicated to all personnel and identified for all work sites.
  • Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures.
  • Risk control measures are identified, prioritised and evaluated against the work schedule.
  • Hazards are identified, OHS risks assessed and control measures are prioritised, implemented and monitored including emergency exits kept clear, to ensure safe systems of work are followed and according to established procedures.
  • Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures.
  • Resources including personnel, equipment, tools and personal protective equipment required for the job are identified, scheduled and coordinated and confirmed in a safe and technical working order.
  • Clients/Customers are provided with possible solutions and/or options within the scope, acceptable cost and requirements.
  • Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work.
  • Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised where applicable in accordance with established procedures.
  • Site is prepared according to the work schedule and to minimise risk and damage to property, commerce, and individuals in accordance with established procedures.
  • Positioning of road signs, barriers and warning devices is planned and coordinated in accordance with requirements.
       
Element: Carry out the installation of oil and gas filled specialised underground cables
  • OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and actioned in accordance with requirements and/or established procedures.
  • First Aid, Rescue and other related work procedures are performed according to requirements and/or established procedures.
  • Lifting, climbing, working in confined spaces and aloft, and use of power tools/equipment, techniques and practices are safely exercised according to requirements.
  • Hazard warnings and safety signs are recognised and hazards and assessed OHS risks are reported to the immediate authorised persons for directions according to established procedures.
  • Remedial actions are taken to overcome any shortfalls encountered in the work schedule according to requirements and/or established procedures.
  • Installation of oil and gas filled specialised underground cables is carried out, in accordance with the work schedule and requirements and/or established procedures.
  • Essential knowledge and associated skills are applied in the safe installation of oil and gas filled specialised underground cables to ensure completion in an agreed timeframe and, to quality standards with a minimum of waste according to requirements.
  • Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements.
  • Ongoing checks of quality of the work are undertaken in accordance with requirements and established procedures to ensure a quality like outcome is achieved for the client/customer and to a community/industry standard.
       
Element: Complete the installation of oil and gas filled specialised underground cables
  • Work undertaken is checked against works schedule for conformance with requirements, anomalies reported and solutions identified in accordance with established procedures.
  • Accidents and/or injuries are reported and followed up in accordance with requirements/established procedures.
  • Work site is rehabilitated, cleaned up and confirmed safe in accordance with established procedures.
  • Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures.
  • Relevant work permit(s) are signed off and, underground cables are returned to service and advised to client/customer in accordance with requirements.
  • Works completion records, reports, as installed /modified drawing(s) and/or documentation and information are confirmed, processed and appropriate personnel notified.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the unit of competency and must be read in conjunction with the performance criteria and the range statement of the unit of competency and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UET12”. Evidence shall also comprise:

A representative body of performance criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the performance criteria and range; and

Apply sustainable energy principles and practices as specified in the performance criteria and range; and

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and

Demonstrate an appropriate level of employability skills; and

Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and

Demonstrated performance across a representative range of contexts from the prescribed items below:

Range of tools/equipment/materials/procedures/workplaces/other variables

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

All of the following:

Oil filled cables

Gas filled cables

B

All of the following:

Specialised cable installation equipment

Winches

Caterpillars

Rollers

Bond lines

Drum jacks

Install cable end caps/nose pull assemblies

C

At least two of the following:

Straight through joint

Straight stop joint

Trifurcating joint

Splitter joint

Trifurcating/transition/stop

D

At least one of the following:

Box termination

Gas filled termination

Compound filled termination

E

At least two of the following:

Welded connectors

Mechanical connectors

Compression connectors

F

At least one occasion

Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual installation of oil and gas filled specialised underground cables.

In addition to the resources listed above, in context of and specific resources for assessment, evidence should show demonstrated competency working at realistic heights above ground i.e. above 3 metres, in limited spaces, with different structural/construction types and method and in a variety of environments.

Method of assessment

9.4)

This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 “Assessment Guidelines”.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this Competency Standard Unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

For optimisation of training and assessment effort, competence in this unit may be assessed concurrently with the following units:

UETTDRCJ30A

Maintain gas and oil filled specialised underground cables

UETTDRCJ31A

Install and maintain polymeric specialised underground cables


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) Essential knowledge and associated skills (EKAS): This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of installing oil and gas filled specialised underground cables.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

KS01-TCJ29A Oil and gas filled specialised underground cables

Evidence shall show an understanding of principles, installation and jointing/terminating of oil or gas filled specialised underground cables to an extent indicated by the following aspects:

T1 Oil and gas filled specialised underground cable principles encompassing:

Legislation, Standards, codes, legislation, supply authority regulations and or enterprise requirements pertaining to the working with oil or gas filled specialised underground cables

Types of oil or gas filled specialised underground cables - properties of paper insulation, oil and nitrogen gas, construction, reasons for gas and or oil filled, characteristics and capabilities of the cable, pressure/volume characteristics of oil and gas

Precautions when handling

Types and functions of tools and equipment used on oil or gas filled specialised underground cables

Techniques when handling, storing and disposing of oil or gas filled specialised underground cables

T2 Installation of oil or gas filled specialised underground cables encompassing:

Legislation, Standards, codes, legislation, supply authority regulations and or enterprise requirements pertaining to the installation of oil or gas filled specialised underground cables

Safety precautions of working with oil or gas filled specialised underground cables - safe operation procedures, Occupational Health and Safety hazards and precautions, dangers of working in confined spaces, identification of OHS hazards, assessing and controlling risks, types, selection, maintenance, storage and uses of personnel protective equipment including intrinsically safe equipment for use in confined and hazardous environments, Permit/Authorisation to work systems and isolation procedures, safe working policies, procedures and practices when using/operating specialised equipment, emergency response and rescue including First Aid etc

Types, function and serviceability of tools and equipment used for the installation of oil or gas filled specialised underground cables

Techniques in the safe installation of oil or gas filled specialised underground cables

Techniques in the safe testing/inspection of the oil or gas filled specialised underground cables to ensure successful installation has occurred

T3 Jointing and terminating oil or gas filled specialised underground cables encompassing:

Legislation, Standards, codes, legislation, supply authority regulations and or enterprise requirements pertaining to jointing and terminating oil or gas filled specialised underground cables

Safety precautions of working with oil or gas filled specialised underground cables - safe operation procedures, Occupational Health and Safety hazards and precautions, dangers of working in confined spaces, identification of OHS hazards, assessing and controlling risks, types, selection, maintenance, storage and uses of personnel protective equipment including intrinsically safe equipment for use in confined and hazardous environments, Permit/Authorisation to work systems and isolation procedures, safe working policies, procedures and practices when using/operating specialised equipment, emergency response and rescue including First Aid etc

Types, function and serviceability of tools and equipment used for the jointing and terminating of oil or gas filled specialised underground cables

Techniques in the safe jointing and terminating oil or gas filled specialised underground cables

Techniques in the safe testing of the oil or gas filled specialised underground cables to ensure successful jointing and/or termination has occurred

T4 Enterprise specific — policy and procedure instructions encompassing:

Responsibilities and duty of care of employer and employee relationship

Methods of obtaining the up-to-date information on enterprise policy and procedures

Rules and regulations

Induction into workplace - location of work area and storage area, timetable, uniform, personal well-being, housekeeping rules, emergency procedures, evacuation procedures

Techniques when deal with others - working in teams, customer relation, complaint and issues procedures.

Overview of enterprise professional development - fire fighting procedures, fatigue management, training and competency development - understanding and promotion

T5 Enterprises specific — OHS instructions encompassing:

Standards, codes, legislation, supply authority regulations and specific enterprise regulations pertaining to the OHS policies and procedures

Methods of obtaining the up-to-date information on enterprise OHS policy and procedures

Specific enterprise personal protection equipment - type and application, where and when to be used, method of replacement, responsibility of maintenance including cleaning inspection and testing, emergency response, rescue, evacuation and First Aid procedures

Personal well-being – hygiene, fatigue/stress management, drugs/alcohol

OHS training - induction training, specific hazard training, specific task or equipment training, emergency and evacuation training, training as part of broader programs such as equipment operation

OHS records including audits, inspection reports, workplace health and environmental monitoring records, training and instruction records, manufacturers and suppliers information such as MSDSs, registers, maintenance reports, workers compensation and rehabilitation records and First Aid/medical records

T6 Enterprises specific — technical drawing and documents encompassing:

Types and application of enterprise specific drawings and documents - electrical and electronic drawings, mechanical drawings, project charts, schedules, graphs, technical manuals and catalogues

Instruction/worksheets sheets - types and application of enterprise specific symbols and diagrams

Title box - description of parts and version control

10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance.

This Competency Standard Unit shall be demonstrated in relation to the installation of oil and gas filled specialised underground cables and may include the following:

Cable type includes: Pressurised oil filled and gas filled cables 33 kV and above.

Testing and recording equipment may include voltage detectors, cable identification equipment, insulation resistance testers.

Jointing and terminating materials: compound and resin filled boxes, paper tape/roll materials, polymeric tape materials, heat shrink materials, “slip on” moulded components, molten solders and gas/oil piping and fittings. compression, mechanical , solder lugs and ferrules and welded connections.

The following constants and variables included in the element/performance criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)

Appropriate authorities

Appropriate work platform

Assessing risk

Assessment

Authorisation

Confined space

Diagnostic, testing and restoration

Documenting detail work events, record keeping and or storage of information

Drawings and specifications

Emergency

Environmental and sustainable energy procedures

Environmental legislation

Environmental management documentation

Established procedures

Fall prevention

Hazards

Identifying hazards

Inspect

Legislation

MSDS

Notification

OHS practices

OHS issues

Permits and/or permits to work

Personnel

Quality assurance systems

Requirements

Testing procedures

Work clearance systems

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Works schedule(s), including drawings, plans, requirements, established procedures, and material lists, are obtained, analysed, if necessary, by site inspection and the extent of the preparation of the work determined for planning and coordination. 
Relevant requirements and established procedures for the work are communicated to all personnel and identified for all work sites. 
Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures. 
Risk control measures are identified, prioritised and evaluated against the work schedule. 
Hazards are identified, OHS risks assessed and control measures are prioritised, implemented and monitored including emergency exits kept clear, to ensure safe systems of work are followed and according to established procedures. 
Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures. 
Resources including personnel, equipment, tools and personal protective equipment required for the job are identified, scheduled and coordinated and confirmed in a safe and technical working order. 
Clients/Customers are provided with possible solutions and/or options within the scope, acceptable cost and requirements. 
Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work. 
Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised where applicable in accordance with established procedures. 
Site is prepared according to the work schedule and to minimise risk and damage to property, commerce, and individuals in accordance with established procedures. 
Positioning of road signs, barriers and warning devices is planned and coordinated in accordance with requirements. 
OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and actioned in accordance with requirements and/or established procedures. 
First Aid, Rescue and other related work procedures are performed according to requirements and/or established procedures. 
Lifting, climbing, working in confined spaces and aloft, and use of power tools/equipment, techniques and practices are safely exercised according to requirements. 
Hazard warnings and safety signs are recognised and hazards and assessed OHS risks are reported to the immediate authorised persons for directions according to established procedures. 
Remedial actions are taken to overcome any shortfalls encountered in the work schedule according to requirements and/or established procedures. 
Installation of oil and gas filled specialised underground cables is carried out, in accordance with the work schedule and requirements and/or established procedures. 
Essential knowledge and associated skills are applied in the safe installation of oil and gas filled specialised underground cables to ensure completion in an agreed timeframe and, to quality standards with a minimum of waste according to requirements. 
Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements. 
Ongoing checks of quality of the work are undertaken in accordance with requirements and established procedures to ensure a quality like outcome is achieved for the client/customer and to a community/industry standard. 
Work undertaken is checked against works schedule for conformance with requirements, anomalies reported and solutions identified in accordance with established procedures. 
Accidents and/or injuries are reported and followed up in accordance with requirements/established procedures. 
Work site is rehabilitated, cleaned up and confirmed safe in accordance with established procedures. 
Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures. 
Relevant work permit(s) are signed off and, underground cables are returned to service and advised to client/customer in accordance with requirements. 
Works completion records, reports, as installed /modified drawing(s) and/or documentation and information are confirmed, processed and appropriate personnel notified. 

Forms

Assessment Cover Sheet

UETTDRCJ29A - Install gas and oil filled specialised underground cables
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRCJ29A - Install gas and oil filled specialised underground cables

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: