Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRIS14B Mapping and Delivery Guide
Install and maintain overhead conductors and cables (poles and structures)
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRIS14B - Install and maintain overhead conductors and cables (poles and structures) |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the installation and maintenance of overhead conductors and cables used on poles and structures (excluding towers) which includes the stringing, tensioning and terminating of the conductor/cable, as well as the cleaning of insulators (de-energised), the securing of the conductor to the insulators or supports and the undertaking of the electrical connections. It also covers maintenance work associated with the diagnosing of faults, the conducting of visual inspections, the confirmation of phasing and the completion of other enterprise tests. It also encompasses the isolation of systems and circuits, the procedure of issuing/accepting electrical access permits and the updating of system data/maintenance records according to requirements and established procedures. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRIS12B Install and maintain poles/structures and associated hardware For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for the installation and maintenance of overhead conductors and cables used on poles and/or structures |
| |||||||
Element: Carry out installation and maintenance of overhead conductors and cables used on poles and/or structures |
| |||||||
Element: Complete the installation and maintenance of overhead conductors and cables used on poles and/or structures |
|