Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UETTDRIS38A Mapping and Delivery Guide
Install and maintain public lighting systems in remote communities

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency UETTDRIS38A - Install and maintain public lighting systems in remote communities
Description 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the installation, maintenance and repair of public lighting systems. This also includes the inspection, testing and commissioning of the system associated with the street lighting circuit, the associated hardware and the earthing system. Installation will include the installation of, the associated hardware and components and, the wiring and earthing system. Maintenance may also include work on energised LV overhead or underground public lighting systems including the diagnosis of faults and the updating of relevant system data and or public lighting maintenance records.
Employability Skills 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements.
Learning Outcomes and Application 2)This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.Common Unit GroupUnit Code Unit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE103A Solve problems in extra-low voltage, single path circuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEE137A Document and apply measures to control OHS risks associated with electrotechnology workUEENEEK101A Maintain safety and tidiness of remote area power supply systemsUEENEEK102A Work safely with remote area power supply systemsUEENEEK116A Maintain and repair remote area power generation facilitiesUEENEEK120A Maintain operation remote area power plantUETTDREL11A Apply sustainable energy and environmental proceduresUETTDREL16A Working safely near live electrical apparatusUETTDRIS32A Solve electrical problems in remote community network apparatusUETTDRIS33A Solve electrical problems in remote community network systemsUETTDRIS99A Test and Verify Distribution Remote Area InstallationsLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”Reading3Writing3Numeracy3
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for the installation and maintenance of public lighting systems
  • Works schedule(s), including drawings, plans, requirements, established procedures, and material lists, are received, analysed and confirmed, if necessary, by site inspection.
  • Relevant requirements and established procedures for the work are communicated to all personnel and identified for all work sites.
  • OHS policies and procedures related to requirements and established procedures for the installation and maintenance of public lighting systems are obtained and confirmed for the purposes of the work to be performed and communicated.
  • Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures.
  • Hazards are identified, OHS risks assessed and control measures are prioritised, implemented and monitored including emergency exits kept clear according to established procedures.
  • Relevant work permits are obtained to access and perform work according to requirements and/or established procedures.
  • Resources including personnel, equipment, tools and personal protective equipment required for the job are obtained and confirmed in working order.
  • Relevant personnel at worksite are confirmed current in First Aid, Pole Top Rescue and other related work procedures according to requirements.
  • Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary.
  • Site is prepared according to the work schedule and to minimise risk and damage to property, commerce, and individuals in accordance with established procedures.
  • Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed where applicable in accordance with established procedures.
  • Traffic management plan is identified and implemented.
       
Element: Carry out installation and maintenance of public lighting systems
  • OHS, sustainable energy and environmental principles and practices to reduce the incidents of accidents and minimise waste are monitored and followed in accordance with requirements and/or established procedures.
  • Lifting, climbing, working in confined spaces and aloft, and use of power tools/equipment, techniques and practices are safely followed and, currency according to requirements confirmed.
  • Essential knowledge and associated skills are applied in the safe installation and maintenance of public lighting systems to ensure completion in an agreed timeframe and, to quality standards with a minimum of waste according to requirements.
  • Excavation/foundation construction is inspected, and confirmed as being in accordance with established procedures.
  • Associated hardware, fittings and control gear are installed as per established procedures.
  • Earthing system and street lighting circuit is installed as per established procedures.
  • Inspection of public lighting and associated hardware is conducted to ascertain that it conforms to requirements/established procedures.
  • Maintenance, including repair and/or replacement of the public lighting system is carried out, in accordance with the work schedule and requirements/established procedures.
  • Hazard warnings and safety signs are recognised and hazards and assessed OHS risks are reported to the immediate authorised persons for directions according to established procedures.
  • Unplanned events in the installation and maintenance of public lighting systems are undertaken within the scope of established procedures.
  • Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills.
  • Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures.
       
Element: Complete the installation and maintenance of public lighting systems
  • Work undertaken is checked against works schedule for conformance with requirements and anomalies reported in accordance with established procedures
  • Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable.
  • Work site is rehabilitated, cleaned up and made safe in accordance with established procedures.
  • Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage or disposed of in accordance with established procedures.
  • Relevant work permit(s) are signed off and, the public lighting system is returned to service in accordance with requirements.
  • Works completion records, reports, as installed /modified drawing and/or documentation and information are finalised and processed and appropriate personnel notified.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

9) This provides essential advice for assessment of the unit of competency and must be read in conjunction with the Performance Criteria and the range statement of the unit of competency and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UET12”. Evidence shall also comprise:

A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and

Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and

Demonstrate an appropriate level of employability skills; and

Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and

Demonstrated performance across a representative range of contexts from the prescribed items below:

Range of tools/equipment/materials/procedures/workplaces/other variables

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

At least one of the following:

Wood

Concrete

Steel

Composite

B

At least two of the following:

HP mercury vapour,

LP and HP sodium vapour

Fluorescent

Quartz-halogen

C

At least three of the following:

Voltage detectors*

Insulation resistance testers

Clamp-on ammeters

Continuity testers

Fault indicators

(* must use)

D

At least one occasion

Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual installation and maintenance of public lighting systems.

In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working below ground, in limited spaces, with different structural/construction types and method and in a variety of environments.

Method of assessment

9.4)

This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 “Assessment Guidelines”.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this Competency Standard Unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no concurrent assessment recommendations for this unit.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

8) Essential Knowledge and Associated Skills (EKAS): This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of installing and maintaining public lighting systems.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

KS01-TIS38A Remote area public lighting and associated equipment

Evidence shall show an understanding of the installation and maintenance of public lighting systems and associated equipment in remote communities to an extent indicated by the following aspects:

T1 Standards, codes, legislation, supply authority regulations, local government and or enterprise requirements pertaining to the installation and maintenance of public lighting systems and associated equipment

T2 Types of lighting systems (Overhead and underground)

T3 Safety precautions specific to working on street lighting (Safe working practices and procedures, Working at heights, Working in confined spaces, Permit to work systems and isolation procedures)

T4 Basic public lighting principles (Electromagnetic spectrum, Principles of colour Behaviour of light, Factors that affect illumination)

T5 Requirements for the use of enterprise construction manuals, system, diagrams/plans and drawings (Constructing streetlight, Street lighting circuits, earthing system)

T6 Types of tools and equipment used for installation and maintenance

T7 Types and function of lanterns/Luminaries/lamps, control equipment, poles and associated hardware used for street lighting (HP mercury vapour, LP and HP sodium vapour, fluorescent, quartz-halogen, wood, concrete, steel, composite, choke boxes, photo-electric cells, time switches, contactor boxes, brackets, street lights standards)

T8 Techniques for the installation of street lighting systems

T9 Techniques for the inspection, testing and commissioning of street lighting systems

T10 Techniques for the maintenance of street lighting systems (diagnosing of faults, removing, repairing, replacement and cleaning of public lighting and associated hardware, controlling and switching of lighting systems)

10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Competency shall be demonstrated in relation to the installation, maintenance and repair of public lighting systems, including the inspection, testing and commissioning of the system associated with the street lighting circuit, the associated hardware and the earthing system.

Maintenance may include the removal, repair, replacement and cleaning of public lighting and associated hardware.

Public lighting system may include lanterns/luminaires, lamps or control equipment in overhead and underground reticulated areas, poles and columns.

Associated hardware may include brackets, choke boxes, photo-electric cells, time switches, contactor boxes and appropriate nuts and bolts.

Testing equipment may include LV detectors and fault indicators.

The following constants and variables included in the element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)

Appropriate authorities

Appropriate work platform.

Assessing risk

Assessment

Authorisation

Confined space

Diagnostic, testing and restoration

Documenting detail work events, record keeping and or storage of information

Drawings and specifications

Emergency

Environmental and sustainable energy procedures

Environmental legislation

Environmental management documentation

Established procedures

Fall prevention

Hazards

Identifying hazards

Inspect

Legislation

MSDS

Notification.

OHS practices

OHS issues

Permits and/or permits to work

Personnel

Quality assurance systems

Requirements

Testing procedures

Work clearance systems

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Works schedule(s), including drawings, plans, requirements, established procedures, and material lists, are received, analysed and confirmed, if necessary, by site inspection. 
Relevant requirements and established procedures for the work are communicated to all personnel and identified for all work sites. 
OHS policies and procedures related to requirements and established procedures for the installation and maintenance of public lighting systems are obtained and confirmed for the purposes of the work to be performed and communicated. 
Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures. 
Hazards are identified, OHS risks assessed and control measures are prioritised, implemented and monitored including emergency exits kept clear according to established procedures. 
Relevant work permits are obtained to access and perform work according to requirements and/or established procedures. 
Resources including personnel, equipment, tools and personal protective equipment required for the job are obtained and confirmed in working order. 
Relevant personnel at worksite are confirmed current in First Aid, Pole Top Rescue and other related work procedures according to requirements. 
Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary. 
Site is prepared according to the work schedule and to minimise risk and damage to property, commerce, and individuals in accordance with established procedures. 
Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed where applicable in accordance with established procedures. 
Traffic management plan is identified and implemented. 
OHS, sustainable energy and environmental principles and practices to reduce the incidents of accidents and minimise waste are monitored and followed in accordance with requirements and/or established procedures. 
Lifting, climbing, working in confined spaces and aloft, and use of power tools/equipment, techniques and practices are safely followed and, currency according to requirements confirmed. 
Essential knowledge and associated skills are applied in the safe installation and maintenance of public lighting systems to ensure completion in an agreed timeframe and, to quality standards with a minimum of waste according to requirements. 
Excavation/foundation construction is inspected, and confirmed as being in accordance with established procedures. 
Associated hardware, fittings and control gear are installed as per established procedures. 
Earthing system and street lighting circuit is installed as per established procedures. 
Inspection of public lighting and associated hardware is conducted to ascertain that it conforms to requirements/established procedures. 
Maintenance, including repair and/or replacement of the public lighting system is carried out, in accordance with the work schedule and requirements/established procedures. 
Hazard warnings and safety signs are recognised and hazards and assessed OHS risks are reported to the immediate authorised persons for directions according to established procedures. 
Unplanned events in the installation and maintenance of public lighting systems are undertaken within the scope of established procedures. 
Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills. 
Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures. 
Work undertaken is checked against works schedule for conformance with requirements and anomalies reported in accordance with established procedures 
Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable. 
Work site is rehabilitated, cleaned up and made safe in accordance with established procedures. 
Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage or disposed of in accordance with established procedures. 
Relevant work permit(s) are signed off and, the public lighting system is returned to service in accordance with requirements. 
Works completion records, reports, as installed /modified drawing and/or documentation and information are finalised and processed and appropriate personnel notified. 

Forms

Assessment Cover Sheet

UETTDRIS38A - Install and maintain public lighting systems in remote communities
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRIS38A - Install and maintain public lighting systems in remote communities

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: