Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRIS60A Mapping and Delivery Guide
Install and replace power system energy meters and associated equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRIS60A - Install and replace power system energy meters and associated equipment |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the installation and replacement of whole current energy meters and associated equipment, where replacement may include the identification of faults in accordance with established procedures and return to service. It includes the requirements to ascertain if normal functions of the meters and associated equipment are in accordance with established procedures. | ||
Employability Skills | 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):Distribution OverheadDistribution Cable JointingElectrotechnology ElectricianCommon Unit GroupUnit CodeUnit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE104A Solve problems in d.c. CircuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in low voltage a.c. CircuitsUETTDREL16A Working safely near live electrical apparatus Distribution Overhead Pathway GroupUnit CodeUnit TitleUETTDRDP12A Maintain overhead energised low voltage conductors and cables UETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS52A Install and maintain poles, structures and associated hardwareUETTDRIS54A Install and maintain poles, structures, overhead conductors and cables UETTDRIS56A Install and maintain low voltage overhead services Distribution Cable Jointing Pathway GroupUnit CodeUnit TitleUETTDRCJ21A Lay ESI electrical cables UETTDRCJ26A Install and maintain de-energised low voltage underground polymeric cables. UETTDRCJ27A Install and maintain de-energised high voltage underground polymeric cables. UETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS55A Install and maintain low voltage underground services Electrotechnology Electrician Pathway GroupUnit CodeUnit TitleUEENEEE137A Document and apply measures to control OHS risks associated with electrotechnology workUEENEEG006A Solve problems in single and three phase low voltage machinesUEENEEG033A Solve problems in single and three phase electrical apparatus and circuitsUEENEEG063A Arrange circuits, control and protection for general electrical installationsUEENEEG103A Install low voltage wiring and accessoriesUEENEEG104A Install appliances, switchgear and associated accessories for low voltage electrical installationsUEENEEG106A Terminate cables, cords and accessories for low voltage circuitsUEENEEG107A Select wiring systems and cables for low voltage general electrical installationsUEENEEG108A Trouble-shoot and repair faults in low voltage electrical apparatus and circuitsUEENEEG109A Develop and connect electrical control circuitsUEENEEK142A Apply environmentally and sustainable energy procedures in the energy sectorLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”Reading3Writing3Numeracy3 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for the installation and replacement of energy meters and associated equipment |
| |||||||
Element: Carry out the installation and replacement of energy meters and associated equipment |
| |||||||
Element: Complete the installation and replacement of energy meters and associated equipment |
|