Employability Skills
Learning Outcomes and Application This unit specifies the outcomes required of live line working team members to work effectively as a cohesive team to ensure safety of all team members and the community when undertaking high voltage (HV) live line work. It includes the pre-work briefing on tasks to be undertaken, roles of individual team members, identification of possible hazards, risk management analysis and implementation of palliative measures to control or mitigate the risk to acceptable levels. It also encompasses the monitoring of work performance to ensure safety, and the post-work debriefing to identify areas for continuous improvement.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Industry Specific Cross Discipline
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan to contribute to a coordinated HV live line work team
  • Work schedules, including drawings, plans, requirements, established procedures and material lists, are obtained and analysed, as necessary, by site inspection and the extent of the preparation of the work determined for planning and coordination by the team
       
Element: Relevant requirements and established procedures for the work are communicated to all team members and identified for all worksites
       
Element: Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the working on HV live lines are obtained and confirmed for the purposes of the work to be performed and discussed among all team members
       
Element: Work is prioritised and sequenced following consultation with all team members to ensure safe systems of work are followed for completion within acceptable timeframes and in accordance with established procedures
       
Element: WHS/OHS and live line work hazards are identified, risk assessments conducted and control measures identified, prioritised, implemented and documented against the work schedule, including the checking of site weather and environmental conditions, to ensure that live line work can be undertaken safely
       
Element: Relevant live line work permits or authority for live line work are secured to coordinate the performance of work by the team according to requirements and/or established procedures
       
Element: Resources, including personnel, equipment, tools and personal protective equipment (PPE), required for the job are identified, scheduled and coordinated and confirmed safe and in technical working order
       
Element: Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised, where applicable, in accordance with established procedures
       
Element: Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work
       
Element: Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
       
Element: All team members to be engaged in the work discuss and agree, without ambiguity, on their respective roles, and possible role changes during the course of work
       
Element: Positioning of road signs, barriers and warning devices is planned and coordinated in accordance with requirements
       
Element: Carry out the contribution to coordinated HV live line work
  • WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and actioned in accordance with requirements and/or established procedures, in particular, established live line working procedures are strictly adhered to
       
Element: First aid, rescue and other related work procedures are performed according to requirements and/or established procedures
       
Element: Lifting, climbing, working aloft, and use of power tools/equipment, techniques and practices, where applicable, are safely exercised according to requirements
       
Element: Live line permits and other provisions for live line work are in place, as required, in accordance with requirements and established procedures
       
Element: Essential knowledge and associated skills are applied in the safe contribution to coordinated HV live line work to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements
       
Element: Work is undertaken on HV live line in a team environment work according to the work schedule and requirements/established procedures
       
Element: Work is shared among all team members in a coordinated manner as discussed and agreed during pre-work briefing
       
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks discussed with team members and reported to immediate authorised personnel for directions according to established procedures
       
Element: Unplanned events in the maintenance of HV live line work are discussed among all team members and appropriate actions undertaken accordingly
       
Element: Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements
       
Element: Ongoing checks of quality of the work are undertaken in accordance with requirements and established procedures to ensure a quality outcome is achieved for the client/customer and to a community/industry standard
       
Element: Complete the contribution to coordinated HV live line work
  • Work undertaken is checked against work schedule for conformance with requirements, anomalies reported and solutions identified in accordance with established procedures
       
Element: Accidents and/or injuries are reported and followed up in accordance with requirements/established procedures
       
Element: Worksite is rehabilitated, cleaned up and confirmed safe in accordance with established procedures
       
Element: Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures
       
Element: Relevant work permits are signed off and HV live line work is returned to service and client/customer advised in accordance with requirements
       
Element: Works completion records, reports, as installed/modified drawings and/or documentation and information are confirmed, processed and appropriate personnel notified
       
Element: Aspects of work schedule are discussed/identified via feedback with fellow team members and information on improvement forwarded to appropriate personnel according to established procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work schedules, including drawings, plans, requirements, established procedures and material lists, are obtained and analysed, as necessary, by site inspection and the extent of the preparation of the work determined for planning and coordination by the team 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and actioned in accordance with requirements and/or established procedures, in particular, established live line working procedures are strictly adhered to 
 
 
 
 
 
 
 
 
 
 
Work undertaken is checked against work schedule for conformance with requirements, anomalies reported and solutions identified in accordance with established procedures 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

UETTDRIS65 - Contribute to coordinated HV live working
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UETTDRIS65 - Contribute to coordinated HV live working

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: