Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRRT01B Mapping and Delivery Guide
Install overhead traction wiring systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRRT01B - Install overhead traction wiring systems |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the installation of overhead traction wiring systems to ensure their proper installation, in particular the correct registration of the contact wire with respect to the current collectors. It includes the undertaking of safe working practices on or about the running line/track and the preparation needed for stringing and profiling including the isolation of systems and circuits for safe working according to work plans. It may also encompass the correct positioning of road signs, barriers and or warning devices, and the procedure of issuing/accepting electrical permits. It also includes the visual and other necessary checks to confirm that equipment and associated hardware have been correctly installed according to design and are in a safe condition to undertake pre-commissioning tests prior to, putting into service, and updating of, installation data such as as-built drawings and relevant quality assurance documentation. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRIS14B Install and maintain overhead structures and electrical apparatus (poles/structures) For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install overhead traction wiring systems |
| |||||||
Element: Carry out the installation of overhead traction wiring systems |
| |||||||
Element: Complete the installation of overhead traction wiring systems |
|