Perform power system substation switching operation to a given schedule
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRSB39A - Perform power system substation switching operation to a given schedule |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the conducting of switching operations in a substation in accordance to a given instructions, switching schedule and established enterprises procedures. It encompasses the operation of substation switching devices such as circuit breakers, air break switches, fuses, reclosers, ring main units and isolators. | ||
Employability Skills | 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):Transmission OverheadDistribution OverheadRail TractionDistribution Cable JointingElectricalCommon Unit GroupUnit Code Unit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE104A Solve problems in d.c. CircuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in low voltage a.c. CircuitsUETTDREL16A Working safely near live electrical apparatus Transmission Overhead Pathway Group UETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDRIS54A Install and maintain poles, structures, overhead conductors and cables UETTDRTP26A Install transmission structures and associated hardware UETTDRTP27A Maintain transmission structures and associated hardware UETTDRTP29A Install and maintain transmission overhead conductors and cables Distribution Overhead Pathway GroupUETTDRDP12A Maintain overhead energised low voltage conductors and cables UETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS52A Install and maintain poles, structures and associated hardwareUETTDRIS54A Install and maintain poles, structures, overhead conductors and cables UETTDRIS56A Install and maintain low voltage overhead services Rail Traction Pathway GroupUETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDRIS52A Install and maintain poles, structures and associated hardwareUETTDRIS54A Install and maintain poles, structures, overhead conductors and cables UETTDRRT21A Install traction overhead wiring systems UETTDRRT22A Maintain traction overhead wiring systems UETTDRRT23A Install rail traction bonds UETTDRRT27A Install overhead traction components and equipment UETTDRRT28A Maintain overhead traction components and equipment Distribution Cable Jointing Pathway GroupUETTDRCJ21A Lay ESI electrical cables UETTDRCJ26A Install and maintain de-energised low voltage underground polymeric cables. UETTDRCJ27A Install and maintain de-energised high voltage underground polymeric cables. UETTDREL11A Apply sustainable energy and environmental procedures UETTDREL12A Operate plant and equipment near live electrical conductors and apparatus UETTDRIS41A Install network infrastructure electrical equipment UETTDRIS42A Maintain network infrastructure electrical equipment UETTDRIS55A Install and maintain low voltage underground services Electrical Pathway GroupUEENEEE137A Document and apply measures to control OHS risks associated with electrotechnology workUEENEEG006A Solve problems in single and three phase low voltage machinesUEENEEG033A Solve problems in single and three phase electrical apparatus and circuitsUEENEEG063A Arrange circuits, control and protection for general electrical installationsUEENEEG106A Terminate cables, cords and accessories for low voltage circuitsUEENEEG108A Trouble-shoot and repair faults in low voltage electrical apparatus and circuitsUEENEEG109A Develop and connect electrical control circuitsUEENEEK142A Apply environmentally and sustainable energy procedures in the energy sectorUETTDRIS67A Solve problems in energy supply network equipmentLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”Reading3Writing3Numeracy3 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for substation switching to a given schedule |
| |||||||
Element: Carry out substation switching to a given schedule |
| |||||||
Element: Complete substation switching to a given schedule |
|