Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRSO47A Mapping and Delivery Guide
Coordinate high voltage transmission network
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | UETTDRSO47A - Coordinate high voltage transmission network |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the monitoring of HV transmission networks in real time. This includes power quality, alarm interpretation, facilitating and monitoring the status of access authorities and ensuring that the network is operated within design parameters at all times. It also includes dispatching and coordination of field repair crews to respond to and rectify abnormalities and liaise with other electrical authorities. | ||
Employability Skills | 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):Common Unit GroupUnit Code Unit TitleUEENEED104A Use engineering applications software on personal computersUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE104A Solve problems in d.c. CircuitsUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEE124A Compile and produce an energy sector detailed reportUEENEEE125A Provide engineering solutions for problems in complex multiple path circuits problemsUEENEEE126A Provide solutions to basic engineering computational problemsUEENEEG101A Solve problems in electromagnetic devices and related circuitsUEENEEG102A Solve problems in electromagnetic devices and related circuitsUEENEEG149A Provide engineering solutions to problems in complex polyphase power circuitsUETTDREL11A Apply sustainable energy and environmental proceduresUETTDREL16A Working safely near live electrical apparatus UETTDRIS62A Implement and monitor the power system organisational OHS policies, procedures and programsUETTDRIS63A Implement and monitor the power system environmental and sustainable energy management policies and proceduresUETTDRSO38A Develop and evaluate power systems transmission switching programsLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”Reading5Writing5Numeracy5 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan for the coordination of HV Transmission networks |
| |||||||
Element: Carry out the coordination of HV Transmission networks |
| |||||||
Element: Complete the coordination of HV Transmission networks |
|