Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRTP05B Mapping and Delivery Guide
Pre-tension stringing transmission overhead conductors and cables
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRTP05B - Pre-tension stringing transmission overhead conductors and cables |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the stringing of overhead conductors and cables with no electrical connections being made. It includes the preparation of the site, the pre-positioning of conductors and fitting of conductor/cable stringing equipment where appropriate and the cleaning of insulators in accordance with works order. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRTP04B Erect transmission tower hardware For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to pre-tension string the transmission overhead conductors and cables |
| |||||||
Element: Carry out pre-tension stringing of transmission overhead conductors and cables |
| |||||||
Element: Complete pre-tension stringing of transmission overhead conductors and cables |
|