Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRTP15B Mapping and Delivery Guide
Install and maintain transmission network infrastructure electrical equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRTP15B - Install and maintain transmission network infrastructure electrical equipment |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the maintenance of non-energised, pyramid, delta, Pi or enterprise specific transmission towers and associated hardware and, the inspection as per requirements of overhead structures such as towers and electrical apparatus. Overhead structures include towers and overhead conductors and or cables include, underground and overhead transition points, electrical equipment, hardware and or earthing systems. This unit encompasses the repair, and or replacement of components in accordance with construction plans, specifications, work orders and standing enterprise requirements. Maintenance could also involve cleaning and welding. The updating of system data, records and or completion of relevant documentation in accordance with enterprise requirements also forms part of this competency. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This Competency Standard Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesEntry into this unit requires a current 'Unrestricted Electrician's Licence' or equivalent issued in an Australian State or Territory or satisfaction of the ERAC requirements for the issue of an unrestricted electrician's licence. Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRTP14B Install and maintain overhead transmission network infrastructure For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare/plan to install and maintain transmission network infrastructure electrical equipment |
| |||||||
Element: Carry out the installation and maintenance of transmission network infrastructure electrical equipment |
| |||||||
Element: Complete the installation and maintenance of transmission network infrastructure electrical equipment |
|