UETTDRTP22A Mapping and Delivery Guide
Establish and reinstate a power systems transmission structure work site
Version 1.0
Issue Date: March 2024
Qualification | - |
Unit of Competency | UETTDRTP22A - Establish and reinstate a power systems transmission structure work site |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis Competency Standard Unit covers the operation/maintenance of support plant and equipment and tools used for excavation work associated with foundations and footings for the construction of transmission towers. It also covers the preparation of the work site and the reinstatement of the ground surface. Scope of maintenance includes and is limited to visual inspection; lubrication; gland nipping; draining of water taps; degreasing; replacing gaskets. Use of relevant personal protective equipment is required. | ||
Employability Skills | 5) The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This Unit is intended to augment formally acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed.Common Unit GroupUnit Code Unit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUETTDREL13A Comply with sustainability, environmental and incidental response policies and proceduresLiteracy and numeracy skills4.2) Participants are best equipped to achieve this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 “Literacy and Numeracy”Reading3Writing3Numeracy3 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to establish and or restore a transmission tower work site schedule of work |
| |||||||
Element: Establish and/or restore the work site schedule of work |
| |||||||