Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRTS02B Mapping and Delivery Guide
Commission network protection and control systems (interdependent)
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRTS02B - Commission network protection and control systems (interdependent) |
---|---|---|---|
Description | 1) 1.1) This Competency Standard Unit covers the commissioning of network protection and control systems in interdependent situations and includes isolation, inspection, monitoring, testing, adjustment, and repair, refurbishment and or overhaul and functional checks. It also includes schemes such as, CB Fail, master controlled Earth Fault, impedance and differential relays intertripping, blocking, synchronising, pilot wire, phase comparison, load shedding, voltage control, parallel operation and load rejection. This includes commissioning of discrete and interdependent schemes. | ||
Employability Skills | 3)The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This competency standards unit is intended to apply to any recognised development program that leads to the acquisition of a formal award at AQF level 5 or higher. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed:. UETTDRTS01B Maintain network protection and control systems (interdependent) For the full prerequisite chain details for this unit please refer to Table 3 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan for the commissioning of network protection and control systems (interdependent) |
| |||||||
Element: Carry out the commissioning of network protection and control systems (interdependent) |
| |||||||
Element: Complete the commissioning of network protection and control systems (interdependent) |
|