AHCSAW302
Implement erosion and sediment control measures


Application

This unit of competency describes the skills and knowledge required to construct, install and maintain a range of measures specified on erosion and sediment control plans.

This unit applies to individuals who work under broad direction and take responsibility for their own work including limited responsibility for the work of others.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.


Elements and Performance Criteria

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for implementation and construction

1.1 Confirm that erosion and sediment control plan and schedule of works match site conditions

1.2 Identify survey pegs and site indicators on site

1.3 Match equipment and tools to program works and terrain on site

1.4 Verify work readiness of selected equipment and tools

1.5 Assess and minimise risks to others and the environment

1.6 Select and use appropriate personal protective equipment

1.7 Select materials to complete proposed works in line with construction schedule

2. Carry out implementation and construction

2.1 Plan work sequence

2.2 Construct earthworks

2.3 Install erosion and sediment control products and materials

3. Carry out repairs and maintenance procedures

3.1 Monitor site, identify issues and carry out repairs as necessary

3.2 Complete maintenance procedures as required

3.4 Clean and store machinery, tools and equipment

3.5 Complete work records

Evidence of Performance

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

construct, install and maintain a range of erosion and sediment control measures

identify hazards and implement safe work procedures

prepare for implementation and construction

read and follow plans to carry out implementation and construction

identify survey pegs and site indicators on site and on the plans

carry out repairs and maintenance procedures to enterprise standards

select equipment and materials appropriate for the task

operate equipment and machinery according to safe work practices and manufacturer instructions

clean and store equipment, machinery and tools according to organisational requirements


Evidence of Knowledge

The candidate must demonstrate knowledge of:

materials cartage pollution control

sequence of working and timing/duration

work health and safety issues relating to the equipment and the site

equipment used

materials suitable for constructing erosion and sediment control measures and where to source them on site

limitations of structures including timing of maintenance, structure life cycle, specifications and standards


Assessment Conditions

Assessors must satisfy current standards for RTOs.


Foundation Skills

Foundation Skills essential to performance are explicit in the performance criteria of this unit of competency.


Range Statement


Sectors

Soil and Water Conservation (SAW)